Within Search :
No. Tenders ID & Tenders Brief
1 Tenders: 23443313 Supply Of Automatic Fire Ball For Fire Extinguishing.
Refer Detail
Due Date : 05/10/2020
MULTI STATE
2 Tenders: 23438080 Supply Of Non Percolating Flexible Fire Hose At Water Works Store Bhopal. Miscellaneous Goods.
3,73,500.00
Due Date : 07/10/2020
MADHYA PRADESH
3 Tenders: 23435007 Supply Of Fire Hoses Or Nozzles.
Refer Detail
Due Date : 13/10/2020
JAMMU AND KASHMIR
4 Tenders: 23434487 Supply Of Automatic Fire Ball For Fire Extinguishing.
Refer Detail
Due Date : 03/10/2020
WEST BENGAL
5 Tenders: 23432583 Hose Fire Suction 100 Mm Dia Internally Armoured Made Out Of Good Hard India Rubber Heavy Duty Reasonaly Flexible For Fir E Fighting Purposes Complete With Vulcanised And G.I.Wire Bound Heavy Duty Standard Round Threaded Suction Fire Hose.
2,30,994.00
Due Date : 21/10/2020
MAHARASHTRA
6 Tenders: 23415308 Supply Of Automatic Fire Ball For Fire Extinguishing.
Refer Detail
Due Date : 01/10/2020
UTTAR PRADESH
7 Tenders: 23401907 Normal Refit (Nr) Of Fb Prema 1 Erection Of Fixed Staging/Scaffolding In Way Of Steel Renewal Work(Based On Volume Basis, Lxbxh). Staging Material To Be Provided By Contractor 2 Fire Sentry For Minimum 10 Hot Work Locations /Day Note: Fire Sentries With Adequate Knowledge Of Fire And Safety Procedures For All Hot Work Locations Will Need To Be Provided I.A.W No 09/12. Sentries Are To Be In Possession Of Required Type Of Fire Extinguishers In Appropriate Quantity. All Sorts Of Fire Safety To Be Ensured By Sentries Upon Completion Of Job / Shift In Surrounding Areas As Well. Asbestos Sheet / Fire Proofing Blankets To Be Provided During Hot Work In Vicinity Of Sensitive Equipment / Electrical Systems Or Cabling, With Vendor Holding Responsibility For Damage And Repairs In Case Of Fire/ Incident. 3 "Cleaning And Gas Free Certification I.A.W No 09/12 Of Fuel / Oil Tanks, Water Ballat Tanks And Fresh Water Tank. Area 3520 Sq M Quote For Service." 4 Pressure Testing Of Underwater Tanks/Void Spaces/Cofferdams. Including Repairs/Blanking Of Manhole Covers( With New Rubber Gaskets/Studs/Bolts/As Required) And Defect Rectification Of All Structural Leaks I.A.W No. 01/15. Material And Spares To Be Provided By Contractor.Ballast Tannks Qty 08, Fuel Tanks 12, Fresh Water Tanks 03, Peak Tank Qty 02. Quote For Service. 5 "Bollard And Fairlead Carry Out Surface Preparation By Hydrojet Blasting Up To Bare Metal To Wj 2 Standard. Repairs To Be Undertaken As Per Hull Survey Report Of Bollards / Fairleads And Stiffening Members In The Vicinity. Bollard (Qty 13), Fairleads (Qty 10). Note: After Hydrojet Blasting, Primer Application To Be Undertaken To Prevent Flash Rusting The Same Is To Be Put Up For Inspection Prior To Repair / Renewal Or Painting To Refit Monitoring Team. Inspection To Be Cleared Post Repairs By Nsry/ Qc Team. Material And Service To Be Provided By Contractor " 6 Renewal Of Sea Tube/Sea Chests. (Including Dpt Of Weld Seam) I.A.W Nes 155, Nes 706. Material And Service To Be Provided By Contractor 7 Pressure Testing Of Sea Tube To 0.2 Bar Upto 10 Mins I.A.W No 01/15. Material And Service To Be Provided By Contractor 8 "Underwater Plating (A) Remove Marine Fouling And Old Paint To Bare Metal From Hull Using Hydrojet Blasting To Wj 2 Standard. (B) Paint Scheme On Full Underwater Hull And Boot Top Including Wind And Water Areas I.E. Area Up To 500Mm Above Boot Top Area Is To Be Restored. (C) Application Of Paint On Underwater Hull And Boot Top Area To Be Carried Out Post Wj 2 Standard.Draught Marks To Be Painted With Underwater Paint Scheme And The Top Coat To Be Painted With White Paint. (I) Forward (Ii) Midship, (Iii) Aft. Renew Defective Draught Marks. Note : Navy Approved Paint Scheme Jotun To Be Applied. Painting To Be Carried Out As Per No 53/16. Material And Service To Be Provided By Contractor" 9 "Above Water Area, Weather Deck Area Carry Out Complete Surface Preparation By Hydro Jet Blasting Up To Bare Metal To Wj 2 Standard. Defects To Be Rectified As Per Hull Survey Report. Carry Out Painting Of Above Water Area With High Performance Advanced Hybrid Coating System As Per Navy Approved Paint Scheme Jotun Mentioned Below And Weather Deck Area To Be Painted With High Performance Non Skid Coating System As Per Navy Approved Paint Scheme Jotun Mentioned Below. (A) Paint Scheme For Above Water Area (Ship Side, Deck And Super Structure): (I) 02 Coats Of Primer To Achieve 80 Microns Dft, (Ii) 02 Coats Of Ral 7040 Colour Specification To Achieve 80 Microns Thickness, (Iii) Total Dft 320 Microns. (B) Paint Scheme Of Weather Deck Area (Upper Deck, Funnel Deck And Bridge Top Deck): (I) 01 Coat Primer Coat Dft 50 Microns, (Ii) 01Coat Anti Corrosive Intermediate Coat Dft 200 Microns, (Iii) 01 Coat Non Skid Top Coat Dft 800 Microns, (Iv)Total Dft 1050 Microns. Material And Service To Be Provided By Contractor " 10 Funnnel And Masts Carry Out Complete Surface Preparation By Manual Chipping/ Buffing Up To Bare Metal (St 3). Clean And Restore Paint Of Surroundings Structure, Funnel And Mast Structure. Heat Resistant Paint On Funnel To Be Applied As Per Navy Approved Paint Scheme Ral 9011(Black) And/Or Ral 9010 (White) And/Or Is 5/ 358 (Buff Colour) As Per No 53/ 16.Note: Painting To Be Carried Out As Per No 53/16. Paint Scheme For Mast: (I) 02 Coats Of Primer To Achieve 80 Microns Dft, (Ii) 02 Coats Of Ral 7040 Colour Specification To Achieve 80 Microns Thickness, (Iii) Total Dft 320 Microns. Material And Service To Be Provided By Contractor. 11 "Machinery Spaces Clean All Bilges, Machinery Foundation And Surface Preparation As Per St 3 Standard And Painting Of The Entire Area. Clean All Limber Holes And Drain Holes. Examine Structures Not Covered By Lagging, Paying Particular Attention To Position Where Water Is Likely To Accumulate, Longitudinal Junctions With Side Plating And Machinery Bearers With Bottom Plating, Horizontal Surfaces Such As Tank Tops, Horizontal Stiffeners And Structure Obscured By Cable Plating. Portable Fittings That Obscure Structure Are To Be Removed For Examination Of Structure Behind. Paint To Be Restored As Per Existing Paint Scheme. Paint To Be Provided By Firm. Material And Service To Be Provided By Contractor " 12 "Machinery Vibration Mounts Manually Clean And Apply Nicole Lacquer On The Vibration Mounts Of All Equipment. 25% Of The Total Mounts Are To Be Replaced Post Undertaking Grouping Of Mounts Based On Spm Checks. Material And Service To Be Provided By Contractor." 13 "Lagging Renew Damaged / Perished Lagging At Various Places Using Pin Method. Renew / Restore In Case Of Existing Areas, Paint Scheme Of Affected Areas Before Renewal Of Lagging. Material And Service To Be Provided By Contractor. " 14 "Cathodic Protection Sacrificial Anodes Renew Total Sacrificial Anodes Fitted To Underwater Hull, Rudders, Rope Guard, Shaft Tunnel, Stern Tubes, Inlets And Outlets, Sea Chest, Bilges And Coffer Dams. Quality Certificate Of The Anode To Be Provided For Newly Fitted Anodes Prior Fitment. Material And Service To Be Provided By Contractor. " 15 Steel Renewal Of Structural Plates (With Stiffeners) Of Deck And Bulkheads Including Tank Tops (Including Degutting Of Lagging, Perforated Paneling, Cabling Assiciated Equipment Minor Eqpts., Brackets, Wooden Fittings, Machinery / Equipment, Switchboard / Control Panels, Electronic And Communication Equipment, All Light Fittings, Pipe Lines, Valves, Electrical Cables, Junction Boxes, Obstructions, Protrusions, Foundation Etc. Etc I.A.W No 09/12 And Testing Of Welds By Dpt, Followed By Re Gutting) Of Thickness As Specified Below With Testing Of Weld Joints By Dpt. Steel Plates Supplied By Yard. All Consumables Material Supplied By Contractor. Quote For Service And Yard Consumables. 16 Minor Repairs Of Wooden Furniture Repair Of Wooden Furniture (Dinning Table Top In Crew And Officer's Dinning Hall 03 Nos.,Wooden Locker In Dinning Hall 02). Mat Wood. Material And Service To Be Provided By Contractor. 17 Repair Of Locking Arrangement Of All Lockers And Cupboards In All Cabins And Wheel House. Material And Spares To Be Provided By Contractor. 18 Plywood At Lockers, Cupboards And Other Wooden Furniture In Various Offices And Accommodations Found Broken / Perished. The Same Is To Be Renewed. Material And Service To Be Provided By Contractor. 19 "Renewal/ Repairs Of Furniture Accommodation And Offices Renewal Of Center Table (Wooden) (Qty 01) (850X500x450h). Material And Service To Be Provided By Contractor." 20 Renewal Of Bunk Lockers (Qty 20) As Per Sample.Material And Sevice To Be Provided By Contractor 21 Renewal Of Sofa With Table (Qty 01) (5 Men Sofa) As Per Sample. Material And Service To Be Provided By Contractor 22 "Renewal Of Mattress With Cover And Their Securing Arrangements. Single Type Mattress (Qty 14). Thickness 6"" As Per Sample. Material And Service To Be Provided By Contractor " 23 Renewal Of Cabin Chairs In Mess Decks (Qty 4). Material To Be Provided By Contractor 24 Renewal Of Chairs In Dining Hall (Qty 06). Material To Be Provided By Contractor 25 "Renewal Of Executive Chairs (Revolving) In Master Cabin, Engine Driver Cabin, Wheel House (Qty 04). Material To Be Provided By Contractor " 26 Anchor, Chain Cable And Cable Locker Lay Out Anchor And Chain Cables And Carry Out Surface Preparation Up To Bare Metal For Survey. Repairs To Be Under Taken As Per Hull Survey Report. Undertake Survey Of Cable And Shackles.Dismantle Anchor And Chain Cable , Clean And Grease All Joining Shackles. Strip And Grease Slip In Cable Locker. Re Arrange Cable Length To Ensure Equality Of Wear. Re Mark Cable Length. Examine Hull Associated Fittings. Clean And Grease Trunion Pin And Housing. Grease To Be Used: Lg 280 Patt No 0474/910 0502. The Machined Surface Of The Joints Of Lugless Joining Shackles Are To Be Examined For Corrosion. All Such Shackles Are To Be Stripped, Greased And Re Assembled. Anchor, Chain Cable And Cable Locker To Be Painted As Per Existing Paint Scheme. Paint To Be Provided By Refittng Firm. (Qty: Anchor 02, Chain Length 275 Mtr). Material And Service To Be Provided By Contractor. 27 "Overhauling Capstan (Mfd Hemant Eng. Works) Following Work To Be Carried Out: (A) Overhauling Of Capstan Along With Motor Assembly And Changing Of Oil. Equipment To Be Proved For Satisfactory Operation. Undertake Weather Proofing Of Motor Terminal Box. (B) Renew All High Speed Bearings. (C) Blow Out All Motor Windings Thoroughly With Clean Dry Air. (D) Clean And Thereafter Varnish Dirty And Oily Windings. (E) Motor To Be Overhauled, With Both Bearings Renewed And Tested Onboard On Load (Subject To Qc Checks). (F) Overhauling Of Brake Mechanism To Be Carried Out. (F) Inspect And Overhaul The Control Panel And Renew Defective Components And Cabling. (G) System To Be Proved For Designed Operation And Load Trials To Be Offered. Material And Service To Be Provided By Contractor" 28 "Overhauling Anchor Winlass (Mfd Hemant Eng. Works) Following Work To Be Carried Out: (A) Overhauling Of Anchor Winch Along With Motor Assembly, Rollers And Anchor Windlass Accessories. Changing Of Oil And Insulation Checks Of The Motor To Be Undertaken. Undertake Weather Proofing Of Motor Terminal Box. Undertake Survey Of Structure Post Load Testing. Structural Defects To Be Rectified, If Any. (B) Renew All High Speed Bearings (6208.2Zr). (C) Blow Out All Motor Windings Thoroughly With Clean Dry Air. (D) Clean And Varnish Dirty And Oily Windings. (E) Motor To Be Overhauled, Both Bearing To Be Renewed And Tested Onboard On Load (Subject To Qc Checks). (F) Overhaul Brake Mechanism. (G) Overhaul The Control Panel, And Renew Defective Components And Cabling. (H) Load Test Details To Be Furnished. Note: Vendor To Cater For All Consumables, Including Pols Topup Required For Energising The Equipment Post Repairs. (J) System To Be Proved For Designed Operation And Load Trials To Be Offered. (K) Carry Out Surface Prepaeation Of Foundation And Structure By Manual Chipping/ Buffing Up To Bare Metal (St 3). Clean And Restore Paint Scheme Post Surface Preparation. Material And Service To Be Provided By Contractor" 29 "Overhauling Of Mushroom Head With Spindle And Valves To Be Undertaken. Operationability Of Quick Shut Off Valve To Be Proved. Wire Mesh To Be Renewed. Material And Service To Be Provided By Contractor " 30 "Overhauling Sewage Treatment Plant (Mfd Hamworthy, England, Model St 3 A C) Undertake Following Routines: (A) Functioning Of Level Switches Of V 1 Tank. Carryout De Sludging Of V 2 Tank By Backflushing Line. Clean The Seawater ‘Y’ Type Strainer At The Inlet To Bookcell. Lub Oil To Be Renewed. Clean Air Supply Filter / Regulator Element In Solvent. Drain, Inspect And Clean The ‘Bookcell’. Remove Large Deposits Of Hard Material With Diluted Hydrochloric Acid. Post Completion Of Routines, Operate System And Inspect For Leaks And Proper Cell Amperage. (B) Inspect The Tightness Of Belt And Check Leakage From Gland Of Discharge Pump. Repack The Gland (If Required). (C) Carry Out Following On Macerator Pump: (I) Check To Ensure There Are No Leakages From The Main Seals. Renew Drive End Bearing And Seals. (Ii) Ensure Impeller Is Free For Rotation With No Vibration. (Iii) Ensure Overload Units Operating Correctly. (Iv) Remove Drain Plugs Provided At Each End Of The Bracket Of The Electric Motor And Allow Any Accumulated Moisture To Drain Away. Replace Damaged Plugs. (D) Clean And Lubricate All Plug Cock Valves. Lubricate Valves In Fully Opened Or Fully Closed Position Only. (E) Post Repairs, Stp To Be Proved For Operation As Per Designed Parameters. (F) Undertake Effluent Test From Nabl Accredited Lab And Check Compliance To Marpol Norms. (G) Sewage Pollution Prevention Certificate Valid For Duration Of Five Years From A State Authorised Accredited Agencies As Specified In Mepc 115(51) And 227(64) As Per Annex Iv Of Marpol 73/78. (H) Carry Out Calibration Of Fixed H2s Sensor. Certificate Of Calibration To Be Obtained From The Oem. Date Of Calibration And Next Due Date Should Be Clearly Indicated On The Certificate. Material And Service To Be Provided By Contractor " 31 " Ventilation Trunking Mechanical Cleaning Of Ventillation Trunking To Be Undertaken And Earthing Strips On Upper Deck And Mess. Paint To Be Restored Post Repairs As Per Existing Paint Scheme. Material And Service To Be Provided By Contractor. " 32 Grease Filters Inside Exhaust Trunking In Galleys To Be Renewed, Qty 02. Material And Service To Be Provided By Contractor. 33 Airvent Pipe Wiremesh And Securing Strips Damaged/ Corroded Of Natural Air Vent (Goose Neck). To Be Renewed. Mat Ms Qty 22. Material And Service To Be Provided By Contractor. 34 Life Raft (A) Renew Hydrostatic Release Gears By Nabl Accredited Agency. (Qty 02) Quote For Material. (B) Life Raft Stowing Brackets (Qty 02) Along With Sliding Ladder Damaged / Corroded. To Be Repaired / Renewed And Operational. Job Involves Renewal Of Life Raft Securing Straps, Slips And Shackles. Quote For Services And Material. 35 "Ladders Carry Out Mechanical Surface Preparation Of All Ladders Up To Bare Metal. Repairs To Be Under Taken As Per Hull Survey Report Of Ladders With Associated Footsteps And Handrails. Paint To Be Restored As Per Existing Paint Scheme. Material And Service To Be Provided By Contractor " 36 "Overhauling Single Arm Boat Davit (Mfd Aquarius Fiberglass Pvt. Ltd): (A) Overhauling Of Boat Davit, Gear Box Along With Motor Assembly. Insulation Checks Of The Motor To Be Undertaken. Undertake Weather Proofing Of Motor Terminal Box. During Trials Motor Parameters Are To Recorded And Same To Be Cleared By Qc. Offer For Trials To Ss Post Completion. (B) Survey Wire Rope, Spare Gear And Other Associated Lifting Gears. Renew As Necessary. (C) Carry Out Load Testing With Davit Fully Rigged Up. After Completion Of Load Test. Examine The Complete Davit Structure And Associated Lifting Gears For Flaws, Distortion, Defecation Etc. Flaws Must Be Examined, Carry Out Repairs If Necessary And Retest. (D) Carry Out Surface Preparation Of Foundation And Structure By Manual Chipping/ Buffing Up To Bare Metal (St 3). Clean And Restore Paint Post Surface Preparation. (E) System To Be Proved For Designed Operation And Load Trials To Be Offered. Material And Service To Be Provided By Contractor. " 37 "Overhauling Rescue Boat Operanlised The Rescue Boat. Carry Out Following: (A) Repair Of Grp Hull Structure And Serviceability Checks Of Boat To Be Carried Out. Undertake Serviceability Checks And Repairs As Required Of All Boat Fittings I.E. Rubbing Strip, Hand Holds, Grab Handels, Life Lines, Slings And Slings Points, Transom,Boat Rope Etc. Reflective Tape To Be Renewed. Carry Out Load Test Of Boat Slings. Trials To Be Carried Out Alongwith Weighing Of Boat With Accessories Post Repairs. Test Certificate To Be Provided. (B) Overhauling Of Motor Boat Engine Including Calibration Of Injectors. (C) Boat Chocks To Be Repaired And Cushion To Be Renewed. Renewal Of All Seating Arrangements Of Boat. (D) Boat Securing Strap (Gripes) To Be Renewed Along With End Fittings. Mat Polyester. (E) 02 In Nos Oars And Boat Hook For Rescue Boat Damaged / Broken. To Be Renewed. (F) Renew Polyester Webbing Boat Sling For Lowering And Hoisting Purpose. Swl 3.5 Ton. Load Test Certificate To Be Provided. Boat Trials To Be Conducted And Proved For Satisfactory Performance. Material And Service To Be Provided By Contractor" 38 "Overhauling Sanitary System Operationlised Complete Sanitary System. (A) Strip, Clean And Overhaul Wc And Urinal Flushing Valves, Reducing Valves And Reducer (Qty 08). (B) Strip And Clean Sanitary System Drain Pipes. Re Galvanize Where Required (Length 18 M). (C) Following Accessories In The Wc And Bathroom To Be Renewed: (A) Hand Shower 04, (B) Wash Basin Tap 04, (C) Commode Seat Cover 03, (D) Commode Flush Knobs 04, (E) Wash Basin Drain Pipe 06 (F) Mixer 05 (G) Shower Curtains 05. Material And Service To Be Provided By Contractor" 39 "Overhauling Domestic Fresh Water System (A) Strip, Clean And Overhaul Domestic Fresh Water System Valves. Stop Cock (Qty 08), Basin Beep Cock (Pillar) (Qty 04), Sink Beep Cock (Pillar) (Qty 01). Material Brass (Chrome Plated). (B) Strip And Clean Domestic Fresh Water System Pipes. Re Galvanize Where Required (Length 15 M). Material And Service To Be Provided By Contractor" 40 Carry Out Surface Preparation Of Foundation And Structure By Manual Chipping/ Buffing Up To Bare Metal (St 3). Repair Clips, Hinges For Looseness And Wedge Pieces For Signs Of Wear And Tear. Examine Leather Washers, Toridal Sealing Rings And Rubber Sealing. Renew Worn Out Parts And Rubber Beading. Carry Out Chalk Test Of All W/T Doors. Paint To Be Restored As Per Existing Paint Scheme. Material And Service To Be Provided By Contractor 41 Repair 05 In Nos Nwt Doors Hinges And Deformed Structure (Including Replacement Of Door Locking Mechanism With Spares, Hinges, Handles, Stoppers, Latches, Hydraulic Door Closing Mechanism And Rubber Beading And Removal And Fitment, Repairs To Coaming Of Door, Structural Coaming, Frames). Material And Service To Be Provided By Contractor 42 "Wt Hatch And Manhole (A) Wt Hatch Carry Out Surface Preparation Of Foundation And Structure By Manual Chipping/ Buffing Up To Bare Metal (St 3). Repairs And Overhauling Of Wt Hatches. (Including Surface Preparation Of Hatch Body And Primer Application, Repairs To Coaming Of Hatches, Structural Coaming, Frames And Straightening Of Bent Hatches By Removal And Fitment, Replacement Of Locks, Auto Locks, Hinge Pins, Hinge Assembly, Rubber Beading And Removal And Fitment).Carry Out Chalk Test Post Repairs And Renew Worn Out Parts As Necessary. (Qty 06) (B) Renewal Of Rubber Beading Of Manholes. (Qty 28) Material And Service To Be Provided By Contractor " 43 "Scuttles And Windows Repair Hinge Fittings, Toughened Glass And Glass Rails For Looseness And Sign Of Wear / Damage. Renew Worn Out Parts And Rubber Beading. Curtain To Be Provided Made By Fire Retardent Cloth. Material To Be Provided By Refitting Firm. Scuttles 07 And Windows 18. Material And Service To Be Provided By Contractor " 44 "Guardrails And Stanchions Renew Guardrail Stanchions And Securing Foundations. Renew All The Earthing Connection Of Guard Rails / Stanchions And Ensure Grounding . Paint Scheme Of The Stantions To Be Restored As Per Paint Scheme . Material And Service To Be Provided By Contractor." 45 "Paint Scheme Renewal Water Ballast Tank And Fresh Water Tank Carry Out Complete Surface Preparation To Bare Hull (Sa 2.5 Standards). Thereafter Paint To Be Restored As Per Existing Paint Scheme Post Repairs As Per Hull Survey Report For The Following Tanks: (A) Water Ballast Tanks 8, (B) Fresh Water Tanks 3, Total Area 2552 Sqm Paint To Be Supplied By Contractor. Material And Service To Be Provided By Contractor." 46 Internal Portion Of Super Structure Damaged Area To Be Prepared Up To Bare Metal And Painting To Be Under Taken As Per Existing Paint Scheme Post Repair Plating, Structures And Fittings Of Various Compartments As Per Hull Survey Report. Paint To Be Supplied By Contractor. Material And Service To Be Provided By Contractor. 47 Steel Renewal Of A/W Structural Plates Along With Stiffeners Of Deck And Bulkheads And Ship Side (Including Degutting Of Lagging, Perforated Paneling, Cabling Associated Equipment Etc I.A.W No 09/12 And Testing Of Welds By Dpt, Followed By Re Gutting)And Thickness As Specified Below:Material Grades: Dmr 249A, Dmr249b, D 40S, Ms, B Quality Steel.Standard : Nes 155, Nes 706. Steel Plates Supplied By Yard And Welding Consumables To Be Supplied By Contractor. Payment On Actuals. Material And Service To Be Provided By Contractor. 48 Fabrication And Fitment Of Minor And Major Foundations (Including Degutting Of Lagging, Perforated Paneling, Cabling Assiciated Equipment Etc I.A.W No 09/12 And Testing Of Welds By Dpt, Followed By Re Gutting).Standard : Nes 155, Nes 706(Steel Supply By Yard And Weld Consumables By Contractor). Material And Service To Be Provided By Contractor. 49 Repair And Refitment Of Panelling Including Regutting Of Lagging, Clamps And Fasteners. Mat Ss Material And Service To Be Provided By Contractor 50 Fabrication And Fitment Of New Panelling Including Regutting Of Lagging, Clamps And Fasteners. Mat Ss Material And Service To Be Provided By Contractor 51 Rubbing Stake Rubber Fenders (Rubbing Stake) All Around The Fuel Barge Found Damaged / Perished. Fenders To Be Renewed. Length 50 Mtr. Material Ebdm/Nbr/Natural Rubber. Material And Service To Be Provided By Contractor 52 Pneumatic Side Fenders (Size L 1160 Mm, Dia 660 Mm) To Be Renewed. (Qty 08) Material And Service To Be Provided By Contractor 53 "Fenders Tyre Fenders Of Barge Found Damaged. Renewal Of Tyre Fenders (Air Craft Old Tyres) (Qty 43) (Aircraft Tyres With Outer Dia 90 Cm) To Be Carried Out. ( Note : Vendor To Clear Qc Checks From User Manager Prior Fitment) . Job Involves Cutting And Welding Assistance For Removal Of Existing Damaged Pad Eyes And Removal And Fitment Of Tyre Fenders. Material And Service To Be Provided By Contractor " 54 "Fenders Renewal Of Eye Pads Associated With Rubber Fenders (Qty 70) . ( Note : Vendor To Clear Qc Checks From User Manager Prior Fitment) . Job Involves Cutting And Welding Assistance For Removal Of Existing Damaged Pad Eyes And Removal And Fitment Of Tyre Fenders.Degutting And Regutting Of Lagging To Be Undertaken. Material And Service To Be Provided By Contractor " 55 "Fenders Renewal Of 20 Mm Galvanised Chain (Qty 120 Mtr) Note : Vendor To Clear Qc Checks From User Manager Prior Fitment . Material And Service To Be Provided By Contractor " 56 "Fenders Renewal Of D Shackle 20 Mm (Qty 100). ( Note : Vendor To Clear Qc Checks From User Manager Prior Fitment) . Material And Service To Be Provided By Contractor " 57 "Life Saving Appliance. Renewal Of Following: (A) Lifebuoy With Self Igniting Light And Smoke Signal (Mob Marker) Quick Release Type To Be Renewed On Bridge Deck (Qty 02), (B) Lifebuoy With Life Line (30M Long) On 01 Deck (Qty 02), (C) Ordinary Lifebuoy Damaged. On Main Deck (Qty 02), (D) Lifebuoy With Self Igniting Light And 30M Buoyant Life Line On 01 Deck (Qty 02). (E) Renewal Of Reflective Tape On All Lifebouys. Material And Service To Be Provided By Contractor" 58 9 Mtr Aluminum Gangway Damaged / Broken. To Be Replaced As Per Existing Gangways. Mat Al, Length 09M. Material And Service To Be Provided By Contractor 59 "Renewal Of Name Board Ships Name Box Along With Lighting Arrangement Defective. To Be Renewed. Mat Ms (Qty 01).Material And Service To Be Provided By Contractor" 60 "Ships Name Board On Port And Stbd Side To Be Renewed. Mat Wood (Qty 02) With Name Engraved By Steel Electroplating. Material And Service To Be Provided By Contractor" 61 "Airvent Pipe And Valve Overhauling Of 36 In Nos Ball Type Check Valves Of Airvent Pipe To Be Undertaken. Repair Structural Defects.Air Vent Valves Of All Ballast Tanks Found To Be Not Holding. Valve To Be Overhauled And Mesh To Be Replaced. Material And Service To Be Provided By Contractor" 62 "Renewal Of Workshop Tables (Mat Ms, Qty 1) And Flag Locker (Mat Ms, Qty 2). Material And Service To Be Provided By Contractor" 63 "Fire Hose Box And Securing Brackets Corroded At Multiple Locations. To Be Renewed. Job Involves Welding, Cutting And Renewal Of Securing Brackets. Material And Service To Be Provided By Contractor " 64 Foundation Of Port And Stbd Search Light Found Deteriorated. Renewal To Be Undertaken. Mat Ms, (Qty 02) Material And Service To Be Provided By Contractor. 65 Rotating Mechanism Of Port And Stbd Search Lights Jammed. Overhauling Of Mechanism To Be Undertakent. (Qty 02). Material And Service To Be Provided By Contractor 66 Securing Arrangement Of Navigation Light (White) On Main Mast To Be Renewed. Mat Ms. Qty 01. Material And Service To Be Provided By Contractor 67 "Fiber Canopy On Main Deck To Be Renewed. Job Involves Complete Renewal Of Stanchions (Mat Stainless Steel), Stanchion Shoes, Securing Strips And Installation With New Fiber Canopy (80 Sqm). Material And Service To Be Provided By Contractor" 68 "Chair Fitted In Wheel House (Qty 01) And Engine Room (Qty 01) Found To Be Broken. Chair To Be Renewed As Per Sample. Job Involves Fitment Of Chair And Renewal Of Securing Brackets. Material And Service To Be Provided By Contractor" 69 "Fixed Wooden Chair To Be Fitted In Wheel House For Operator. Job Involves Fitment Of Chair And Renewal Of Securing Brackets. Mat Wood. Material And Service To Be Provided By Contractor" 70 "Mob Marker Brackets In Bridge Wing (Port And Stbd) Damaged/ Broken. To Be Renewed. Job Involves Welding And Cutting Assistance. Mat Ms, Qty 02. Material And Service To Be Provided By Contractor " 71 "Curtains In Dining Hall To Be Renewed With Fittings As Per Sample. Mat Synthetic Pvc. Dimensions 4 Feet X 6 Feet, Qty 03 Material And Service To Be Provided By Contractor " 72 Sounding Cap Of Various Tanks Threads Worn Out On Both End. To Be Renewed. Mat Brass. Material And Service To Be Provided By Contractor 73 Box For Storing Life Buoy Found Damaged. Boxes To Be Renewed. Job Involves Fitment Also. Mat Wood. Qty 02 Material And Service To Be Provided By Contractor 74 "Air Line On Main Deck Corroded / Broken At Various Locations. To Be Renewed In Situ. Job Involves Welding And Cutting Assistance. Mat Ms. Material And Service To Be Provided By Contractor " 75 Hot Plate Locker In Galley Damaged / Broken. To Be Renewed. Mat Ms (As Per Sample) Material And Service To Be Provided By Contractor 76 Metal Locker In Galley Damaged / Broken. To Be Renewed. Mat Ss. (As Per Sample) Material And Service To Be Provided By Contractor 77 Imo Stickers To Be Renewed All Around Ship.(Qty 120). Material And Service To Be Provided By Contractor 78 Fire Extinguisher Securing Brackets To Be Renewed Including Associated Degutting Of Lagging / Panelling / Equipment / Cabling And Regutting. Job Involves Welding And Cutting Assistance. Qty 10. Material And Service To Be Provided By Contractor 79 05 In Nos Marine Wall Clock To Be Renewed. Material To Be Provided By Contractor. 80 "Portable Aluminum Ladder Broken / Damaged. To Be Renewed. Mat Al Material And Service To Be Provided By Contractor (As Per Sample)." 81 "Port And Stbd Main Engine (M/S Cummins India Ltd, Model Kta 19 M4 (Running Hours Port: 2500; Stbd; 2500) : Carry Out Following Routines / Work: (A) Change Engine Oil, Oil Filter And By Pass Filter (B) Clean Pre Cleaner Dust Pan Of Air System (C) Change Air Cleaner Element (D) Change Coolant (E) Clean Fuel Filter / Water Separator (F) Change Marine Gear Oil (G) Adjust Throttle Linkage, Rectify Defect If Any (H) Change Fuel Filter, (J) Clean Fuel Tank Breather, (K) Clean Crankcase Breather, (L) Renew Heat Exchanger Zinc Plugs, (M) Renew Belts, (N) Calibrate Injectors And Adjust Valves, (P) Replace Rocker Cover Gaskets, (Q) Overhaul Starting Motor, (R) Port Main Engine Starting Panel Indicator Light Not Working, To Be Renewed, (S) Stbd Main Engine Digital Rpm Indicator In Lcp Not Working. To Be Replaced, (T) Port Main Engine Lub Oil Cooler Sea Water Discharge Pipe Corroded. Pipe To Be Renewed. Mat Gi, Dia 65 Mm. Length 01 Meter, (U) Leakage Observed From Port Main Engine Lub Oil Hand Pump. Defect To Be Rectified, (V) Renew All Instrumentation Gauges And Fittings (Rpm, Lub Oil Pressure, Lub Oil Temp, Water Temp, Voltmeter, Hour Counter), (W) Remove, Dismantle, Chemically Clean, Assemble And Pressure Test To Required Pressure With Spares For Fresh Water And Lub Oil Heat Exchangers Of Both Main Engine. (X) Carry Out Sdc Checks Of Both Main Engines Local Control Panel And Wheel House Control Panel, Rectify Defects If Any. (Y) Carry Out Sdc Checks Of Both Main Engine, Rectify Defects If Any. Quote For Service " 82 Port And Stbd Main Engine, Cummins, Model ( Kta 19 M4) Resistor,Corrosion (10 Litres) 83 Belt,V Ribbed 84 Element,Lub Oil Filter 85 Separator,Fuel Water 86 Element,Oil Bypass Filter 87 Valvoline Premium Blue 7800 Plus 1/55 Ltr 88 Inhibitor,Corrosion 10 Liters 89 Gasket,Rocker Lever Cover 90 Tachometer 91 Hose,Flexible 92 Element,Air Cleaner 93 Hose,Flexible 94 Cap,Filler 95 Hose,Plain 96 Clamp,T Bolt 97 Gasket,Connection 98 Clamp,T Bolt 99 Gasket,Tor Cnv Oil Cooler 100 Gasket,Oil Cooler Core 101 Draincock 102 Gasket,Lub Oil Clr Hsg 103 Hose,Plain 104 Clamp,Tube 105 Clip 106 Seal,O Ring 107 Hose,Plain 108 Seal,O Ring 109 Hose,Flexible 110 Indicator,Restriction 111 Washer,Sealing 112 Seal,O Ring 113 Seal,Injector 114 Seal,O Ring 115 Hose,Plain 116 Clamp,Hose 117 Hose,Flexible 118 Seal,O Ring 119 Seal,O Ring 120 Switch,Pressure 121 Switch,Temperature 122 Switch,Temperature 123 Kit,Oil Cooler 124 Sensor,Temperature 125 Sensor,Engine Speed 126 Sensor,Pressure 127 Pickup,Magnetic 128 Gauge,Temperature 129 Gauge,Pressure 130 Port And Stbd Da (M/S Cummins India Ltd,) (Running Hours Port: 6000; Stbd: 6500) Carry Out Following Routines: (A) Remove Intake Manifold. Clean And Pressure Test, (B) Remove Turbocharger. Clean, Inspect And Repair With New Spares, (C) Remove Fuel Injection Pump. Clean, Inspect, Calibrate And Repair With New Spare Parts, (D) Remove Rocker Levers And Shaft. Clean, Inspect And Repair With New Spares, (E) Remove Injectors, Clean, Inspect, Repair And Calibrate With New Spares, (F) Remove Fuel Connections (High Pressure Pipe Lines). Clean, Inspect And Repair With New Spares, (G) Remove Push Rods. Clean, Inspect. Replace If Required, (H) Dismantle Cylinder Head. Clean, Inspect And Repair With New Spare Parts, (J) Dismantle One Piston And One Con Rod Assembly. Replace If Required. Based On Inspection, Undertake Inspection Of Balance Piston / Connecting Rods Accordingly, (K) Dismantle One Liner For Inspection Of Liner Outer Surface Pitting. Replace If Require, (L) Replace Fresh Water Pump, (M) Remove Belt Tensioner. Clean, Inspect And Repair With New Spare Parts, (N) Remove And Replace Fuel Feed Pump, (P) Replace Sea Water Pump, (Q) Remove Starter Motor. Clean, Inspect, And Repair With New Spare Parts , (R) Replace All Hoses Of Cooling System, Air System, Lub Oil And Fuel Systems, (S) Replace All Zinc Plugs, (T) Check /Tighten All Foundation Bolts, (U) Clean All Dismantled Parts And Cylinder Block Top Position. Assemble Engine With All New Gaskets / 'O' Rings, Seals And Above Dismantle Sub Assemblies, (V) Carry Out Tappet Setting. For 6 Ct/Cta 8.3 D(M) Valve Setting Intake Valve Clearance Is 0.012” And Exhaust Valve Clearance Is 0.024”), (W) Clean All Contact Studs And Bolts From Rust Cleaner And To Be Tightened, (X) Check Avr For Serviceability. Carry Out Calibration, After Calibration Of Avr Undertake The Voltage Control Test And Paralleling Trials, (Y) All Loose Screws To Be Tightened, (Z) Carry Out Calibration Of Over Voltage Protection Unit (Ovpu), Reverse Power Relay, (Aa) Undertake Trials On Completion Of Overhaul Viz. Full Load Trials, Voltage Control Test, Speed Control Test And Paralleling Trials, (Ab) Carry Out Calibration Checks Of All Instrumentation/Gauges, (Ac) Carry Out Sdc Checks Of Both Da Local Control Panel, Rectify Defects If Any. (Ad) Post Completion Of Routines, Carry Out Sdc Checks (Hot And Cold), Rectify Defects If Any. Start The Engine And Check All Gauges, Replace If Required, Check For Any Oil/ Water Leakage, Exhaust Leakage, Stop The Engine And Re Check Engine Oil Level, Top Up If Require. Carry Out Load Trials And Observe Parameters. System To Be Proved For Satisfactory Performance. Quote For Service 131 Main Diesel Alternator, Cummins, Model: 6 Cta 8.3(Dm) Pump Water 132 Seal O Ring 133 Screw, Hex Flange Head Cap 134 Connection, Exhaust Outlet 135 Gasket, Exhaust Out Connection 136 Flange Weld 137 Clip 138 Switch Magnetic 139 Gasket, Int Manifold Cover 140 Screw, Hex Flange Head Cap 141 Hose, Flexible 142 Clamp T Bolt 143 Hose, Plain 144 Seal, Rectangular Ring 145 Clip 146 Hose, Plain 147 Gasket, Breather 148 Kit Air Cleaner Element (6C 200Kva) 149 Clamp T Bolt 150 Clamp T Bolt 151 Gasket Connection 152 Clamp V Band 153 Clamp Hose 154 Gasket Lub Oil Clr Cover 155 Core Cooler 156 Gasket, Oil Cooler Core 157 Cap Filler 158 Belt V Ribbed 159 Element Lub Oil Filter 160 Guide Valve Stem 161 Insert Valve 162 Seal Valve Stem 163 Valve Intake 164 Valve Exhaust 165 Spring Valve 166 Clip 167 Seal Rectangular Ring 168 Pin Timing 169 Clamp Injector 170 Seal Injector 171 Filter Coolant 172 Valve Check 173 Screw Benjo Connector 174 Gasket Exhaust Manifold 175 Joint Ball 176 Stud 177 Gasket Cover Plate 178 Clamp Hose 179 Switch Coolant Level 180 Hose Flexible 181 Gasket Oil Suc. Connection 182 Gasket Oil Pan 183 Sensor Temperature 184 Sensor Pressure 185 Pickup Magnetic 186 Bolt Connecting Rod 187 Nut Connecting Rod 188 Gasket Oil Drain 189 Seal O Ring 190 Seal Benjo Connector 191 Hose Flexible 192 Seal O Ring 193 Gasket Sea Water Pump 194 Gasket Hydraulic Pump 195 Hose Plain 196 Clamp Hose 197 Tensioner Belt 198 Screw Hex Flange Head Cap 199 Thermostat 200 Gasket Turbocharger 201 Nut Hexagon Flange 202 Stud 203 Kit Hx40 Turbo Repair 204 Separator Fuel Water 205 Indicator Restriction 206 Inhibitor Corrosion 10 Liters 207 Kit Upper Engine Gasket 208 Set Lower Engine Gasket 209 Screw Hex Flange Head Cap 210 Connection Oil Supply 211 Screw Rkr Lever Adjusting 212 Filter Fuel 213 Actuator Etr Fuel Control 214 Control Governor 215 Screw Hexagon Head Cap 216 Connection Water Inlet 217 Cover Access Hole 218 Damper Vibration 219 Support Fan 220 Cylinder Head 221 Injector 222 Lever Rocker 223 Manifold Oil 224 Motor Starting 225 Pulley Alternator 226 Gear Fuel Pump 227 Exchanger Heat 228 Isolator Vibration 229 Pin Piston 230 Pump Fuel Injection 231 Pump Lubricating Oil 232 Aftercooler 233 Connection Water Outlet 234 Gear Flywheel Ring 235 Gasket Rear Cover 236 Kit Engine Piston 237 Bearing Connecting Rod 238 Kit Liner 239 Thermostat 240 Camshaft 241 Gear Camshaft 242 Key Plain Woodruff 243 "Port And Stbd Gear Box (Model Twin Disc Model Mgx5222dc (Running Hours Port: 2500; Stbd; 2500): Carry Out Following Routines: (A) Change Lub Oil And Lub Filter, (B) Overhaul Control Valve, (C) Clean Suction Strainer, (D) Overhaul Lub Oil Manifold, (E) Inspect Primary And Secondary Shaft Assemblies, (F) Renew Primary And Secondary Clutch Plate, (G) Grease The Oil Seal On The Output End Of The Output Shaft Through The Grease Filling With Water Pump, (H) Check Shaft Oil Seal For Leakage, Renew If Defective, (J) Renew All Zinc Rods, (K) Lub Oil Coolers To Be Removed, Chemically Cleaned, Pressure Tested And Refitting, (L) Sea Water Leakage Observed From Gear Box Lub Oil Cooler, Leakage To Be Rectified. (M) Carry Out Overhauling Of Control Panels. (N) Carry Out Sdc Checks Of Both Gear Box Assembly, Rectify Defects If Any. System To Be Proved For Satisfactory Performance. Quote For Service" 244 Gear Box Twin Disc (Far East) Ltd. Filter Element 245 Gasket Oil Pump 246 Gasket Top Cover 247 Ring Back Up 248 Filter Element 249 Filter Element 250 Gasket 251 O Ring 252 O Ring 253 Seal Oil 254 Lube Oil Pump 255 Gear Box Oil Sae 40 256 "Fuel And Lub Oil Centrifuge (Make Gea Westfalia, Model Otc2 02 137): Carry Out Following Routines: (A) Replace Bow / Hood Gaskets, (B) Replace Drive Belts, (C )Replace Grooved Ball Bearings, (D) Lubricate Motor Bearing, (E) Replace Rubber Metal Coating, (F) Replace Radial Packing Ring, (G) Oil Change And Through Cleaning Of The Drive Chamber. (H) Carry Out Overhauling Of Starting Control Panels. Quote For Service" 257 West Falia Fuel Oil Purifier Major Service Kit 258 Service Kit For Pump 259 "Ows (Make Victor Marine Model Cs 500): Carry Out Following Routines / Work On Oily Water Separator: (A) Undertake Full Servicing Of The Equipment Including Pump Overhaul, (B) Replace The First Stage Coalescer Pack (C) Renew The Advanced Granular Media (D) Restore Interior Coating. (E) Recalibration Of 15 Ppm Monior To Be Carried Out. Prove System For Satisfactory Operation. (F) Carry Out Overhauling Of Starting Control Panel. Quote For Service" 260 Oily Water Separator (Make Victor Marine, Model Cs1000) : Coalescer (Set) 261 End Plate (Set) 262 Advance Granular Media(Set) 263 Wadding (Filter Mesh) 264 Gasket Set (Inc Hatch Gasket) 265 Feed Pump Stator 266 "Reciprocating Air Compressor (Make Elgi, Model Lg 02 100 (Md Comp) : Carry Out Following Routines: (A) Calibrate All Pressure Gauges (Range 0 To 17.5 Kg/Cm2) (Qty 02), (B) Carry Out Complete Overhaul Of Compressor. Trials To Be Conducted And System To Be Proved For Satisfactory Performance. (C) Unloader Valve Defective / Malfunctioning. To Be Replaced. (D) Carry Out Overhauling Of Starting Control Panels. Quote For Service" 267 Reciprocating Air Compressors, Make Elgi (Model Hp 10 300) Kit, Complete Overhaul 268 "Co2 Fire Fighting System Carry Out Following Routines: (A) Renew All Flexible Hoses (Qty 10), (B) Overhaul Non Return Valves And Safety Stop Valves, (C) Remove And Inspect Cylinder Operating Heads And Bursting Discs, Test For Correct Functioning, (D) Undertake Hydro Pressure Testing Of All Bottles At 1.5 Times Of Working Pressure (Qty 06) And Submit Report. (E) Carry Out Weight Test Of All 06 Co2 Cylinders And Refill Gas If Required. (F) Co2 Remote Control Panel Limit Switch Not Working. To Be Replaced (Qty 02). System To Be Proved For Satisfactory Performance. Quote For Service And Material" 269 "Shafting: Carry Out Following Routines: (A) Clean And Grease Propellers, (B) Open Top Half Bearing Casing Of Plummber Blocks And Inspection To Be Undertaken.Replace Defective Bearings. (C) Lubricate The Bearings. (D) Post Completion Of Routines, Trials Of Shafting To Be Undertaken. System To Be Proved For Satisfactory Operation. Quote For Service And Material " 270 "Avcat Striping Pump (Make: Tushaco Pumps, Model: T3st 45 /46, 6 Tph (Type Screw Pump), Qty 02): (A) Overhaul The Pumps, Test Relief Valve And Reset On Completion. Set Pr 6 Kg/Cm2, Size 50Mm. (B) Calibrate Suction And Discharge Pressure Gauge ( 1 To 3) Kg/Cm2 And (0 To 6) Kg/Cm2 . (C) Alignment Of Pump To Be Carried Out. (D) Carry Out Overhauling Of Starting Control Panels. System To Be Proved For Satisfactory. Quote For Service" 271 Avcat Striping Pump, Make: Tushaco Pumps, Model: T3st 45 /46, 6 Tph (Type Screw Pump) Gasket 272 Pump Bearing 273 Mechanical Seal 274 Fuel Flow Meter 275 Cargo Lshsd Pump No.1 And 2 (Make: Tushaco Pumps, Model: Tdsh 118/064, Type Screw Pump): (A) Overhaul The Pumps, Test Relief Valve And Reset On Completion. Set Pr 6 Kg/Cm2, Size 50Mm. (B) Calibrate Suction And Discharge Pressure Gauge ( 1 To 3) Kg/Cm2 And (0 To 6) Kg/Cm2 . (C) Alignment Of Pump To Be Carried Out. (D) Carry Out Overhauling Of Starting Control Panels. System To Be Proved For Satisfactory. Quote For Service 276 Cargo Lshsd Pump No.1 And 2 (Make: Tushaco Pumps, Model: Tdsh 118/064) Gasket 277 Pump Bearing 278 Mechanical Seal 279 Rv Spring 280 Cargo Avcat Pump No.1 And 2 (Make: Tushaco Pumps, Model: Tdsh 105/058, Type Screw Pump): (A) Overhaul The Pumps, Test Relief Valve And Reset On Completion. Set Pr 6 Kg/Cm2, Size 50Mm. (B) Calibrate Suction And Discharge Pressure Gauge ( 1 To 3) Kg/Cm2 And (0 To 6) Kg/Cm2 . (C) Alignment Of Pump To Be Carried Out. (D) Carry Out Overhauling Of Starting Control Panels. System To Be Proved For Satisfactory. Quote For Service 281 Cargo Avcat Pump (Make: Tushaco Pumps, Model: Tdsh 105/058) Gasket 282 Pump Bearing 283 Mechanical Seal 284 Rv Spring 285 "Steering Gear (Make Geeta Engineering, Model Tr2c 2 X 2.1.35(Lg 02100)): Carry Out Following Routines. (A) Adjust Safety Valve On Rudder Motor And Pump Unit As Per Manual I.E. 62.5 Bar. (B) Calibrate All Pressure And Temperature Gauges. (C) Remove And Clean Magnetic Filters Mounted To The Pump Tanks. (D) Drain Hydraulic Oil, Clean All Filter And Tanks, Charge With Fresh Oil. System To Be Proved For Satisfactory Performance. (E) Rudder Angle Indicator Back Light Not Working And Sluggish Response At Wheel House. Defect Is To Be Rectified And System To Be Proved For Satisfactory Operation. (F) Carry Out Checks Of Steering Gear Control System From Wheel House And Local Control Panel And Prove The System For Correct Operation. Quote For Service." 286 Steering Gear, Make Geeta Engineering, Model Tr2c 2 X 2.1.35 Model (Lg 02100) Seal Kit For Hydraulic Pump 287 O' Ring Kit For Relief Valve 288 Pressure Gauge (0 210 Kg/Cm2) 289 Solenoid For Dc Valve 290 Return Line Filter 291 Suction Filter 292 Level Gauge 293 Piston O Ring 294 Potentiometer Coil 295 Oil Seal 296 Contactor C1 297 Relays R1 R5 298 Relays R6 R8 299 Indication Lamps 300 Rudder Angel Indicator 301 Limit Switch 302 Buzzer B2 303 Bilge / Ballast Pump (Make: Jhonsons, Model: Cv 65 160): (A) Overhauling Of Pumps To Be Carried Out. (B) Calibrate Suction And Discharge Pressure Gauge ( 1 To 3) Kg/Cm2 And ( 1 To 5) Kg/Cm2. (C) Alignment Of Pump To Be Carried Out (D) Carry Out Overhauling Of Starting Control Panel. System To Be Proved For Satisfactory. Quote For Service 304 Bilge Pump/ Ballast Pump Paper Gasket 305 Impeller 306 Flange Gasket 307 Pump Free End Bearing 308 Pump Drive End Bearing 309 Mechanical Seal(Msgberxc) 310 Fuel Oil Transfer Pump (Make Tushaco Pumps. Model: T3st 45/46, Type Screw Pump) (A) Overhauling Of Pumps To Be Carried Out. (B) Calibrate Suction And Discharge Pressure Gauge ( 1 To 3) Kg/Cm2 And ( 1 To 5) Kg/Cm2. (C) Alignment Of Pump To Be Carried Out (D) Carry Out Overhauling Of Starting Control Panel. System To Be Proved For Satisfactory. Quote For Service 311 Fuel Oil Transfer Pump (Make Tushaco Pumps. Model T3st 45/46) Gasket 312 Pump Bearing 313 Mechanical Seal 314 Emergency Fire Pump (Make: Jhonsons, Model: Ch 80 400) (A) Overhauling Of Pumps To Be Carried Out. (B) Calibrate Suction And Discharge Pressure Gauge ( 1 To 3) Kg/Cm2 And ( 1 To 5) Kg/Cm2. (C) Alignment Of Pump To Be Carried Out (D) Carry Out Overhauling Of Starting Control Panel. System To Be Proved For Satisfactory. Quote For Service 315 Emergency Fire Pump (Make: Johnson, Model: Ch 80 400) Impeller 316 Wearing Ring 317 Gasket Set 318 Cap Nut 319 Bearing 320 Bearing 321 Shaft Sleeve 322 Impeller Key 323 Air Wheel Key 324 Mechanical Seal 325 Gs/Fire Pump (Make: Jhonsons, Model: Cv 40 250, 30 Tph) (A) Overhauling Of Pumps To Be Carried Out. (B) Calibrate Suction And Discharge Pressure Gauge ( 1 To 3) Kg/Cm2 And ( 1 To 5) Kg/Cm2. (C) Alignment Of Pump To Be Carried Out (D) Carry Out Overhauling Of Starting Control Panel. System To Be Proved For Satisfactory. Quote For Service 326 Fire Pump/ Gs Pump Impeller 327 Wearing Ring 328 Shaft Sleeve(32 Dia) 329 Motor Bearing 330 Mechanical Seal 331 Fresh Water Hydrophore Pump (Make Marcony Trading) Mechanical Seal Observed To Be Leaking And Performance Of The Pump Observed To Be Sub Optimal. Overhauling And Alignment Of Pump To Be Carried Out And System To Be Proved For Designed Perfomance. Carry Out Overhauling Of Starting Control Panel. Quote For Service And Material 332 Hinges To Be Provided/Fabricated On Chequred Plates Of Engine Room For Operating System Valves. Quote For Service And Material 333 Fresh Water Hydrphore Tank: Renewal The Coating Of Hydrophore Tank. Calibrate Pressure Gauges. Range (0 To 7) Kg/Cm2. Minor Air Leakage Observed In System, To Be Rectified. Quote For Service And Material 334 Sea Water Hydrphore Tank: Renewal The Coating Of Hydrophore Tank. Calibrate Pressure Gauges. Range (0 To 7) Kg/Cm2. Minor Air Leakage Observed In System, To Be Rectified. Quote For Service And Material 335 Portable Gensets (Make Pelican, Petrol Engine, 1.6 Kva) Overhaul Emergency Generator Set Including Calibration Of Instrumentation. Proved For Satisfactory Operation. Carry Out Overhauling Of Starting Control Panel. Quote For Service And Material 336 Portable Gensets (Make Pelican, Petrol Engine, 1.6 Kva) Overhaul Emergency Generator Set Including Calibration Of Instrumentation. Proved For Satisfactory Operation. Quote For Material 337 Dd Pump (Make Perfect, 40 Tph): Overhaul Pump Including Calibration Of Instrumentation Gauges. Quote For Service And Material 338 Overhaul Portable Discharge Pump Including Motor Parts, Capacity 2 Bhp. Quote For Service And Material 339 Renewal Of Digital Flow Meter (Qty 02) In Fuelling System. Quote For Service. And Material 340 Avcat Pressure Gauge Reading On Avcat Filter Not Readable, View Present Location. Relocation Of Pressure Gauge To Be Carried Out. Quote For Service And Material 341 Fire Hydrant In Pump Room Obstructing Avcat Filter Cover. Hydrant To Be Relocated. Job Involves Cutting And Welding. Quote For Service And Material 342 Port Gear Box Lub Oil Cooler Sea Water Discharge Pipe Corroded. Pipe To Be Renewed. Mat Gi, Dia 45 Mm, Length 01 Meter. Quote For Service And Material 343 Various System Valves Wheel Corroded / Damaged. Valve Wheels To Be Renewed. Quote For Service And Material 344 Remote Operation Of Fuel Shut Off Valves Observed To Be Sub Optimal. The Same Is To Be Overhauled. Quote For Service And Material 345 Split Acs Fitted In Wheel House And Bridge Observed To Be Malfunctioning And Needs To Be Renewed. (Make Voltas, Cap 2 Tr). Quote For Service And Material 346 Forward Hand Pump Not Operating, Pump To Be Overhauled. Quote For Service And Material 347 System Pipelines: Removal, Chemical Clean And Repair System Pipelines To Be Undertaken, Followed By Pressure Testing To 1.5 Times Working Pressure(Kg/Cm2). Therefafter Undertake Fitment Onboard And Prove For Designed Performance (Galvanised Steel 150Mm). Quote For Service And Material 348 System Pipelines: Removal, Chemical Clean And Repair System Pipelines To Be Undertaken, Followed By Pressure Testing To 1.5 Times Working Pressure(Kg/Cm2). Therefafter Undertake Fitment Onboard And Prove For Designed Performance (Galvanised Steel 125Mm). Quote For Service And Material 349 System Pipelines: Removal, Chemical Clean And Repair System Pipelines To Be Undertaken, Followed By Pressure Testing To 1.5 Times Working Pressure(Kg/Cm2). Therefafter Undertake Fitment Onboard And Prove For Designed Performance (Galvanised Steel 80Mm). Quote For Service And Material 350 System Pipelines: Removal, Chemical Clean And Repair System Pipelines To Be Undertaken, Followed By Pressure Testing To 1.5 Times Working Pressure(Kg/Cm2). Therefafter Undertake Fitment Onboard And Prove For Designed Performance (Galvanised Steel 65Mm). Quote For Service And Material 351 System Pipelines: Removal, Chemical Clean And Repair System Pipelines To Be Undertaken, Followed By Pressure Testing To 1.5 Times Working Pressure(Kg/Cm2). Therefafter Undertake Fitment Onboard And Prove For Designed Performance (Galvanised Steel 50Mm). Quote For Service And Material 352 System Pipelines: Renew With End Fittings Of Air Vent And Filling System (150Mm) (Carbon Steel), Pressure Test To 1.5 Times Working Pressure(Kg/Cm2), Fit Onboard And Prove. Quote For Service And Material 353 System Pipelines: Renew With End Fittings Of Air Vent And Filling System (100Mm) (Carbon Steel), Pressure Test To 1.5 Times Working Pressure(Kg/Cm2), Fit Onboard And Prove. Quote For Service And Material 354 System Pipelines: Renew With End Fittings Of Air Vent And Filling System (65Mm) (Carbon Steel), Pressure Test To 1.5 Times Working Pressure(Kg/Cm2), Fit Onboard And Prove. Quote For Service And Material 355 Sea Water Pipeline: Renew With End Fittings Of Fire Fighting, Bilge, Fuel Oil, Ballast , Sea Water Cooling System (150Mm) (C Ni), Pressure Test To 1.5 Times Working Pressure(Kg/Cm2), Fit Onboard And Prove. Quote For Service And Material 356 Sea Water Pipeline:
Refer Detail
Due Date : 03/10/2020
KARNATAKA
8 Tenders: 23396790 Supply Of Automatic Fire Ball For Fire Extinguishing.
Refer Detail
Due Date : 28/09/2020
MULTI STATE
9 Tenders: 23386340 Supply Of Automatic Fire Ball For Fire Extinguishing.
Refer Detail
Due Date : 28/09/2020
MULTI STATE
10 Tenders: 23378878 Supply Of Industrial Items. 1 G. I . Wire 10 Swg 50 Kgs 07 Days 2 G. I. Nut And Bolt 5/16" X2.5" 5 Kgs Saoner Mine No.3 3 G. I. Nutand Bolt 3/8" X2.5" 2 Kgs Free Of Cost Annexturea 4 G. I. Washer 5/16" 2 Kgs 5 G.I. Washer 3/8" 2 Kgs 6 Pvc Tape 3/4" 150 Roll 7 Gland Packing 3/8" 5 Kgs 8 Gland Packing 5/8" 10 Kgs 9 Gland Packing 1/2" 10 Kgs 10 Gland Packing 3/4" 5 Kgs 11 T. R. Compound 10 Kgs 12 Ball Valve 1' (Brass) 2 Nos 13 Lock 40Mm 5 Nos 14 G. I. Wire 14 Swg 30 Kgs 15 Wire Nail 2.5" 30 Kgs 16 Earth Leakage Relay 0 To 750 Ma ,12V 2 Nos 17 Timmer 550V 2 Nos 18 Adhesive Solution 5 Ltr 19 Fire Fighting Station Bucket
Refer Detail
Due Date : 19/09/2020
MAHARASHTRA
Show Page: 1 2 3 4 5 6 7 8 9 10 ...   Show:

Fire Fighting Consumables Tenders

Tenders information of Fire Fighting Consumables Tenders in India and Indian tenders for Fire Fighting Consumables , Tender document For Fire Fighting Consumables , Fire Fighting Consumables tenders, Fire Fighting Consumables Tender information, Live Tender for Fire Fighting Consumables , Closed Tender for Fire Fighting Consumables , Free Tender for Fire Fighting Consumables , Free Full Tender Details for Fire Fighting Consumables . Live Chat Available for tenders information.