Within Search :
No. Tenders ID & Tenders Brief
1 Tenders: 24248284 Nh 7 To Amaravai Via Narayanpur, Peddamudalapad In Alampur Constituency Of Jogulamba Gadwal District, (I) Earth Work Excavation For Forming Or Widening (Ii) Construction Of Gsb (Iii) Providing And Laying Wbm/Wmm (Iv) Providing 20Mm Thick Ogpc With Seal Coat (V) C.D. Works (Vi) Cc Road
25,46,504.00
Due Date : 22/01/2021
TELANGANA
2 Tenders: 24160848 Maintenance Of Ipd And Miscellaneous Work.. Earth Work In Open Excavation Upto 2M Depthin Foundation,Trench,Drains,Pits Including Dressing Of All Sides In All Kinds Of Soil Likehard Soil,Boulder Studded Soil,Wet Soil Including Removal Of Slush Etc.,Dewatering If Necessaryandstacking Of The Excavated Earth Witha Lead Upto 100 M. Refilling Excavated Earth In Trenches, Plinth, Sides Of Foundation Etc. In Layer Not Exceeding 200 Mm In Depth Including Consolidation Of Each Layer By Ramming And Watering, Lead Upto 50.00 Mtr And Lift Upto 1.50 Mtr. Surface Dressing Of The Ground Including Removing Vegetation And Inequalities Not Exceeding 75 Mm Deep And Disposal Of Rubbish, Lead Upto 50.00 Mtr And Lift Upto 1.50 Mtr,
Refer Detail
Due Date : 14/01/2021
ORISSA
3 Tenders: 24142700 Gsp Work From Rajeev Gandhi School To Chenaram Kantiwal Ward No 18. (Earth Work In Excavation In Soil .)
3,50,000.00
Due Date : 04/01/2021
RAJASTHAN
4 Tenders: 24137163 Isolation Stoppings Work In Kolihan Copper Mines Miscellaneous Services. 1 20 Mm Cement Plaster Of Mix :1:6 (1 Cement: 6 Fine Sand) 2 Random Rubble Masonary With Hard Stone In Superstructure Above Plinth Level And Upto Floor Two Level, With Cement Mortar 1:6 (1 Cement :6 Fine Sand). Stone Only, Shall Be Supplied Free Of Cost At Site, By Company. 3 Earth Work In Excavation By Mechanical Means (Hydraulic Excavator) / Manual Means In Foundation Trenches Or Drains (Not Exceeding 1.5 M In Width Or 10 Sqm On Plan) Including Dressing Of Sides And Ramming Of Bottoms, Lift Upto 1.5 M, Including Getting Out The Excavated Soil And Disposal Of Surplus Excavated Soil As Directed, Within A Lead Of 50 M All Kinds Of Soil. 4 Providing And Laying In Position Cement Concrete Of Specified Grade Excluding The Cost Of Centering And Shuttering All Work Up To Plinth Level :1:3:6 (1 Cement : 3 Coarse Sand : 6 Graded Stone Aggregate 20 Mm Nominal Size). 5 Centering And Shuttering Including Strutting, Propping Etc. And Removal Of Form For : Foundations, Footings, Bases Of Columns, Etc. For Mass Concrete.
Refer Detail
Due Date : 21/01/2021
RAJASTHAN
5 Tenders: 24068732 Clearing The Site By Dismantling The Bund After Completion Of The Work Bailing Out Water Using 5Hp Pump Earth Work In Excavation By Mechanical Means Dry Rubble Masonry Laying In Position Cement Concrete R Cement Concrete Work Steel Reinforcement For R Cement Concrete Work Civil Works Buildings.
Refer Detail
Due Date : 30/12/2020
KERALA
6 Tenders: 24068694 Earth Work In Excavation By Mechanical Means R Cement Concrete Works Steel Reinforcement For R Cement Concrete Work Steel Work In Built Up Tubular Trusses Painting Providing Corrugate G S Sheet Roofing Finishing Walls With Acrylic Smooth Exterior Paint Civil Works Buildings.
Refer Detail
Due Date : 30/12/2020
KERALA
7 Tenders: 24023568 Karbala Kuva. Earth Work In Excavation In Foundation, Trenches Etc. Including Dressing Of Sides And Ramming Of Bottoms, Including Getting Out Theexcavated Material, Refilling After Laying Pipe/ Foundation And Disposal Of Surplus Excavated Material At A Lead Upto 50M Suitable Site As Per Direction Of Engineer For Following Depths, Below Natural Ground / Road Top Level. In All Types Soils/ Saturated Soil Such As Moorum, Sand, Sandy Silt,Clay, Black Cotton Soil, Kankar, Etc. Depth Upto 1.5 M
14,72,000.00
Due Date : 21/12/2020
RAJASTHAN
8 Tenders: 23992674 R K College To Phulmahal Miscellaneous Works. Earth Work In Excavation In Foundation, Trenches Etc. Including Dressing Of Sides And Ramming Of Bottoms, Including Getting Out The Excavated Material, Refilling After Laying Pipe/ Foundation And Disposal Of Surplus Excavated Material At A Lead Upto 50M Suitable Site As Per Direction Of Engineer For Following Depths, Below Natural Ground / Road Top Level. In All Types Soils/ Saturated Soil Such As Moorum, Sand, Sandy Silt, Clay, Black Cotton Soil, Kankar, Etc. Depth Upto 1.5 M Dismantling Tile Work In Floors And Roofs Laid In Cement Mortar Including Stacking Material Within 50 Metres Lead. For Thickness Of Tiles Above 25 Mm And Upto 40 Mm Removing White Or Colour Wash By Scrapping And Sand Papering And Preparing The Surface Smooth Including Necessary Repairs To Scratches Etc. Complete Steel Work Welded In Built Up Sections/ Framed Work Including Cutting, Hoisting, Fixing In Position And Applying A Priming Coat Of Approved Steel Primer Using Structural Steel Etc. As Required. In Gratings, Frames, Guard Bar, Ladder, Railings, Brackets, Gates And Similar Works Providing And Laying Lean Cement Concrete 1:4:8 In Sub Base Over A Prepared Sub Grade With Coarse And Fine Aggregate Conforming To Is: 383, The Size Of Coarse Aggregate Not Exceeding 25 Mm, Aggregate Cement Ratio Not To Exceed 15:1, Aggregate Gradation Etc Providing And Laying In Position Cement Concrete Of Specified Grade Excluding The Cost Of Centring And Shuttering All Work Upto Plinth Level : 1:1½:3 (1 Cement : 1½ Coarse Sand : 3 Graded Stone Aggregate 20 Mm Nominal Size). Random Rubble Masonry With Hard Stone In Foundation And Plinth : Cement Mortar 1:6 (1 Cement : 6 Coarse Sand) Cement Plastering Including Tandp, Scaffolding, Material And Complete Labpour, Including Cost Of Water, Curing, Racking Of Joints Etc. With 15 Mm Cement Plaster Of Mix : 1:4 (1 Cement : 4 Fine/ Coarse Sand) Repairs To Plaster Of Thickness 12Mm To 20Mm In Patches Of Area 2.5 Sq. Metres And Under Including Cutting The Patch In Proper Shape, Raking Out Joints And Preparing And Plastering The Surface Of The Walls Complete Including Disposal Of Rubbish To The Dumping Ground Within 50Metres Lead : With Cement Mortar 1:4 (1 Cement : 4 Fine Sand) Painting With Synthetic Enamel Paint Of Approved Brand And Manufacture To Give An Even Shade :Two Or More Coats On New Work Wall Painting With Plastic Emulsion Paint Of Approved Brand And Manufacture To Give An Even Shade.One Or More Coats On Old Work As Per Plaster
37,10,000.00
Due Date : 21/12/2020
RAJASTHAN
9 Tenders: 23992671 Agresen Nagar Cc Miscellaneous Works. Earth Work In Excavation For Roadway, Including Trimming Bottom And Side Slopes In Accordance With Requirement Of Line, Grades And Cross Sections, Including Disposal Of Surplus Material With All Lift And Lead Upto 1000 Metre As Per Mortandh Specification Clause 301.All Type Soil Carriage Of Materials Bymechanical Transport Including Loading,Unloading And Stacking :: Earth For 1 Km Providing And Laying Lean Cement Concrete 1:4:8 In Sub Base Over A Prepared Sub Grade With Coarse And Fine Aggregate Conforming To Is: 383, The Size Of Coarse Aggregate Not Exceeding 25 Mm, Aggregate Cement Ratio Not To Exceed 15:1, Aggregate Gradation After Blending To Be As Per Table 600 1, Cement Content Not To Be Less Than 150 Kg/ Cum, Optimum Moisture Content To Be Determined During Trial Length Construction, Concrete Strength Not To Be Less Than 10 Mpa At 7 Days, Mixed In Concrete Mixer, Laid Manualy, Compacted With Surface Vibrator, Finishing And Curing Complete As Per Clause 601, 112 Of Mortandh Specification Including All Material, Labour, Machinery, Lighting, Guarding And Maintenance Of Diversion. Providing And Laying Un Reinforced, Plain Cement Concrete Mix With Concrete Mixer And Vibrator Pavement Over A Prepared Sub Base With 43 Grade Cement , Coarse And Fine Aggregate Conforming To Is: 383, Maximum Size Of Coarse Aggregate Not Exceeding 25 Mm, Mixed As Per Approved Mix Design, Laid, Spread, Compacted And Finished In A Continuous Operation Including Provision Of Contraction, Expansion, Construction And Longitudinal Joints Etc Including All Material, Labour, Machinery, Lighting, Guarding And Maintenance Of Diversion.Pcc M 20 Earth Work In Excavation In Foundation, Trenches Etc. Including Dressing Of Sides And Ramming Of Bottoms, Including Getting Out The Excavated Material, Refilling After Laying Pipe/ Foundation And Disposal Of Surplus Excavated Material At A Lead Upto 50M S Carriage Of Materials Bymechanical Transport Including Loading,Unloading And Stacking :: Earth For 1 Km Providing And Laying In Position Cement Concrete Of Specified Grade Excluding The Cost Of Centring And Shuttering All Work Upto Plinth Level Code) 1:4:8 (1 Cement : 4 Fine/ Coarse Sand : 8 Graded Stone Aggregate 40 Mm Nominal Size). Providing And Laying In Position Cement Concrete Of Specified Grade Excluding The Cost Of Centring And Shutteringt All Work Upto Plinth Level1:1½:3 (1 Cement : 1½ Coarse Sand : 3 Graded Stone Aggregate 20Mm Nominal Size) 40 Mm Thick Fine Dressed Stone Flooring Over 20 Mm (Average) Thick Base Of Cement Mortar 1:5 (1 Cement : 5 Coarse Sand) Including Pointing With Cement Mortar 1:2 (1 Cement : 2 Stone Dust) With An Admixture Of Pigment To Match The Shade Of Stone. Red Sand Structural Steel Work Riveted, Bolted Or Welded In Built Up Sections, Trusses And Framed Work, Including Cutting, Hoisting, Fixing In Position And Applying A Priming Coat Of Approved Steel Primer All Complete:
26,47,000.00
Due Date : 21/12/2020
RAJASTHAN
10 Tenders: 23992667 Rk Community Divider Miscellaneous Works. Earth Work In Excavation For Roadway, Including Trimming Bottom And Side Slopes In Accordance With Requirement Of Line, Grades And Cross Sections, Including Disposal Of Surplus Material With All Lift And Lead Upto 1000 Metre As Per Mortandh Specification Clause 301.All Type Soil Carriage Of Materials Bymechanical Transport Including Loading,Unloading And Stacking :: Earth For 1 Km Providing And Laying Lean Cement Concrete 1:4:8 In Sub Base Over A Prepared Sub Grade With Coarse And Fine Aggregate Conforming To Is: 383, The Size Of Coarse Aggregate Not Exceeding 25 Mm, Aggregate Cement Ratio Not To Exceed 15:1, Aggregate Gradation After Blending To Be As Per Table 600 1, Cement Content Not To Be Less Than 150 Kg/ Cum, Optimum Moisture Content To Be Determined During Trial Length Construction, Concrete Strength Not To Be Less Than 10 Mpa At 7 Days, Mixed In Concrete Mixer, Laid Manualy, Compacted With Surface Vibrator, Finishing And Curing Complete As Per Clause 601, 112 Of Mortandh Specification Including All Material, Labour, Machinery, Lighting, Guarding And Maintenance Of Diversion. Providing And Laying Un Reinforced, Plain Cement Concrete Mix With Concrete Mixer And Vibrator Pavement Over A Prepared Sub Base With 43 Grade Cement , Coarse And Fine Aggregate Conforming To Is: 383, Maximum Size Of Coarse Aggregate Not Exceeding 25 Mm, Mixed As Per Approved Mix Design, Laid, Spread, Compacted And Finished In A Continuous Operation Including Provision Of Contraction, Expansion, Construction And Longitudinal Joints Etc Including All Material, Labour, Machinery, Lighting, Guarding And Maintenance Of Diversion.Pcc M 20 Earth Work In Excavation In Foundation, Trenches Etc. Including Dressing Of Sides And Ramming Of Bottoms, Including Getting Out The Excavated Material, Refilling After Laying Pipe/ Foundation And Disposal Of Surplus Excavated Material At A Lead Upto 50M S Carriage Of Materials Bymechanical Transport Including Loading,Unloading And Stacking :: Earth For 1 Km Providing And Laying In Position Cement Concrete Of Specified Grade Excluding The Cost Of Centring And Shuttering All Work Upto Plinth Level Code) 1:4:8 (1 Cement : 4 Fine/ Coarse Sand : 8 Graded Stone Aggregate 40 Mm Nominal Size). Providing And Laying In Position Cement Concrete Of Specified Grade Excluding The Cost Of Centring And Shutteringt All Work Upto Plinth Level1:1½:3 (1 Cement : 1½ Coarse Sand : 3 Graded Stone Aggregate 20Mm Nominal Size) 40 Mm Thick Fine Dressed Stone Flooring Over 20 Mm (Average) Thick Base Of Cement Mortar 1:5 (1 Cement : 5 Coarse Sand) Including Pointing With Cement Mortar 1:2 (1 Cement : 2 Stone Dust) With An Admixture Of Pigment To Match The Shade Of Stone. Red Sand Structural Steel Work Riveted, Bolted Or Welded In Built Up Sections, Trusses And Framed Work, Including Cutting, Hoisting, Fixing In Position And Applying A Priming Coat Of Approved Steel Primer All Complete:
28,14,000.00
Due Date : 21/12/2020
RAJASTHAN
Show Page: 1 2 3 4 5 6 7 8 9 10 ...   Show:

Earth Excavation Tenders

Tenders information of Earth Excavation Tenders in India and Indian tenders for Earth Excavation , Tender document For Earth Excavation , Earth Excavation tenders, Earth Excavation Tender information, Live Tender for Earth Excavation , Closed Tender for Earth Excavation , Free Tender for Earth Excavation , Free Full Tender Details for Earth Excavation . Live Chat Available for tenders information.