|
|
 |
|
 |
|
|
(DD/MM/YYYY)
Banking and Insurrance | Central Government | Diversified | Education and Research
Institutes |
Health and Medical Institutions | Municipality and Corporation | Private Companies
|
Public Sector Undertakings (PSUs) | State Government | Trusts, NGOs And Co-Operatives
|
1
|
TR 2986695 Overall Development of Village Chola Sahib - Construction of Streets and Internal Roads, Disposal of Storm Water and Development of Parks and Parking.
|
TR 2986695 Overall Development of Village Chola Sahib - Construction of Streets and Internal Roads, Disposal of Storm Water and Development of Parks and Parking.
| PUNJAB | 7,33,00,000.00 | 23/12/2012 |
|
2
|
TR 2920340 Improvements To Road Yaranal Village,Improvements To Raod From Mattiwade Bus Stand To Sulagaon Road
|
TR 2920340 Improvements To Road Yaranal Village,Improvements To Raod From Mattiwade Bus Stand To Sulagaon Road
| KARNATAKA | 3,95,325.00 | 30/11/2012 |
|
3
|
TR 2921622 Providing Of ST And BT To Approach Road At Khokurle Tal.Gaganbawada Dist.Kolhapur.
|
TR 2921622 Providing Of ST And BT To Approach Road At Khokurle Tal.Gaganbawada Dist.Kolhapur.
| MAHARASHTRA | 8,78,100.00 | 12/11/2012 |
|
4
|
TR 2921624 Providing Of ST And BT To Main Road SH-125 To Khotwadi At Undri Tal.Panhala Dist.Kolhapur.
|
TR 2921624 Providing Of ST And BT To Main Road SH-125 To Khotwadi At Undri Tal.Panhala Dist.Kolhapur.
| MAHARASHTRA | 10,99,500.00 | 12/11/2012 |
|
5
|
TR 3328562 Provision of Approach Road, Galvolume Roof Over Approach Pathway for building No. P-54, HDPE Water Tank for Maintenance of Arboriculture of Football Ground, Provision of Floor Tiling and Connected works, Installation of 07 Washing Machines and 07 Driers, Provision of Garden illumination and Certain Electro Mechanical Services.
|
TR 3328562 Provision of Approach Road, Galvolume Roof Over Approach Pathway for building No. P-54, HDPE Water Tank for Maintenance of Arboriculture of Football Ground, Provision of Floor Tiling and Connected works, Installation of 07 Washing Machines and 07 Driers, Provision of Garden illumination and Certain Electro Mechanical Services.
| GOA | 12,31,000.00 | 27/08/2012 |
|
6
|
TR 3087898 Special Repair of residence- non residence building and Road work.
|
TR 3087898 Special Repair of residence- non residence building and Road work.
| GUJARAT | Refer Detail | 08/08/2012 |
|
7
|
TR 3349116 “Supply And Stacking Of Stone Boulder, Stone Metal 40mm, Stone Chips 20mm And Coarse Sand Between Km 164.000 To Km 200.000 On Dimapur-Kohima – Mao Road For Construction Of Covered Drain, Opened Lined Drain At Built Up Market Areas On Dimapur-Kohima –Mao Road Under The Jurisdiction Of 89 RCC/15 BRTF/ Project Sewak In The State Of Nagaland”
|
TR 3349116 “Supply And Stacking Of Stone Boulder, Stone Metal 40mm, Stone Chips 20mm And Coarse Sand Between Km 164.000 To Km 200.000 On Dimapur-Kohima – Mao Road For Construction Of Covered Drain, Opened Lined Drain At Built Up Market Areas On Dimapur-Kohima –Mao Road Under The Jurisdiction Of 89 RCC/15 BRTF/ Project Sewak In The State Of Nagaland”
| NAGALAND | 85,00,000.00 | 22/07/2012 |
|
8
|
TR 3379503 Construction Of RCC Drain, CC Road, BT Road, UGD Line, Construction Of 4 No. Of Check Post, Construction Of 6 No. Of Urinals & Sinking Of Borewell To Main Market Yard Of Apmc Gulbarga.
|
TR 3379503 Construction Of RCC Drain, CC Road, BT Road, UGD Line, Construction Of 4 No. Of Check Post, Construction Of 6 No. Of Urinals & Sinking Of Borewell To Main Market Yard Of Apmc Gulbarga.
| KARNATAKA | Refer Detail | 17/07/2012 |
|
9
|
TR 3362790 Improvements to Khnapur Talaguppa SH-93 from km no. 0.00 to 23.00 and 24.55 to 34.58 Road.
|
TR 3362790 Improvements to Khnapur Talaguppa SH-93 from km no. 0.00 to 23.00 and 24.55 to 34.58 Road.
| KARNATAKA | 22,66,02,000.00 | 12/07/2012 |
|
10
|
TR 3317080 Road work.
|
TR 3317080 Road work.
| GUJARAT | Refer Detail | 11/07/2012 |
|
11
|
TR 3373169 Improvements to Hirisave-Chattahalli SH-8 from km 80.80 to km 94.20 (in selected reaches) (Arkalgud taluk). Improvements to Hirisave-Chattahalli SH-8 from km 105.55 to km 12g_g7 (in selected reaches) (Sakleshpura taluk). Improvements to Huliyar-Keralapura SH-102 from km 144.39 to km 150.252 (in selected reaches) (Arkalgud taluk).
|
TR 3373169 Improvements to Hirisave-Chattahalli SH-8 from km 80.80 to km 94.20 (in selected reaches) (Arkalgud taluk). Improvements to Hirisave-Chattahalli SH-8 from km 105.55 to km 12g_g7 (in selected reaches) (Sakleshpura taluk). Improvements to Huliyar-Keralapura SH-102 from km 144.39 to km 150.252 (in selected reaches) (Arkalgud taluk).
| KARNATAKA | 20,57,00,000.00 | 11/07/2012 |
|
12
|
TR 3373374 Improvements to Hutiyaru Keratapura Road SH. 102 from K.M. 75.28 to K.M 99.08 (in selected reaches) and (47b) Improvements to Huliyaru Kerarapura Road SH.t02 from K.M 99.()8 to K.M 144.39.
|
TR 3373374 Improvements to Hutiyaru Keratapura Road SH. 102 from K.M. 75.28 to K.M 99.08 (in selected reaches) and (47b) Improvements to Huliyaru Kerarapura Road SH.t02 from K.M 99.()8 to K.M 144.39.
| KARNATAKA | 32,57,00,000.00 | 11/07/2012 |
|
13
|
TR 3365490 Improvements in selected reaches of Ekkumbi-Molkalmur SH No.1)2 from Km 8.20 in Haogal taluka to Km 88.49 in Haveri taluka.
|
TR 3365490 Improvements in selected reaches of Ekkumbi-Molkalmur SH No.1)2 from Km 8.20 in Haogal taluka to Km 88.49 in Haveri taluka.
| KARNATAKA | 20,98,69,000.00 | 09/07/2012 |
|
14
|
TR 3365502 Improvements to Mylar - Toranagal SH-40 from km 0.0 (Mylara-in Hadagali Taluk) to km 97.33 ( Hanasi in HB Hali Taluka).
|
TR 3365502 Improvements to Mylar - Toranagal SH-40 from km 0.0 (Mylara-in Hadagali Taluk) to km 97.33 ( Hanasi in HB Hali Taluka).
| KARNATAKA | 18,78,00,000.00 | 09/07/2012 |
|
15
|
TR 3365637 Improvements to Karwar llkal SH-06 from Km 199.73 to Km 271 .60.( in Selected reaches) (From Shirahatti taluka Border to Kotumachagi)
|
TR 3365637 Improvements to Karwar llkal SH-06 from Km 199.73 to Km 271 .60.( in Selected reaches) (From Shirahatti taluka Border to Kotumachagi)
| KARNATAKA | 29,82,07,000.00 | 09/07/2012 |
|
16
|
TR 3372030 Improvement to Hunsur-Talacuvery SH-90 from Km 61.00 to Km .117.50 (In Selected Reaches) and Improvement to Virajpet-Byndoor SH-27 from Km 0.00 to Km 100.19
|
TR 3372030 Improvement to Hunsur-Talacuvery SH-90 from Km 61.00 to Km .117.50 (In Selected Reaches) and Improvement to Virajpet-Byndoor SH-27 from Km 0.00 to Km 100.19
| KARNATAKA | 17,06,47,000.00 | 09/07/2012 |
|
17
|
TR 3373617 Improvement To Road
|
TR 3373617 Improvement To Road
| KARNATAKA | 31,56,44,000.00 | 09/07/2012 |
|
18
|
TR 3384150 Improvements to Sira Nanjangud road SH-84 from Km 13-75 to 49-25 and improvements to Chikahally SH-3 from Km 165-88 to 170-08.
|
TR 3384150 Improvements to Sira Nanjangud road SH-84 from Km 13-75 to 49-25 and improvements to Chikahally SH-3 from Km 165-88 to 170-08.
| KARNATAKA | 18,42,96,000.00 | 09/07/2012 |
|
19
|
TR 3364688 Improvements To Padubidri Chikkalagudda SH-01 From 478.77 Km To 497.35 (From Hidkal Dam Pump House To Chikkalgudda In Selected Reaches In Hukkeri Taluka) (Package No 15a).
|
TR 3364688 Improvements To Padubidri Chikkalagudda SH-01 From 478.77 Km To 497.35 (From Hidkal Dam Pump House To Chikkalgudda In Selected Reaches In Hukkeri Taluka) (Package No 15a).
| KARNATAKA | 20,82,26,000.00 | 09/07/2012 |
|
20
|
TR 3384023 Improvements to Bagalkote Biligirirangabetta road (SH-57) from ch. 610.30 to 656.50Km.
|
TR 3384023 Improvements to Bagalkote Biligirirangabetta road (SH-57) from ch. 610.30 to 656.50Km.
| KARNATAKA | 13,23,00,000.00 | 09/07/2012 |
|
|
 |
|
 |
|