|
|
 |
|
 |
|
|
(DD/MM/YYYY)
Banking and Insurrance | Central Government | Diversified | Education and Research
Institutes |
Health and Medical Institutions | Municipality and Corporation | Private Companies
|
Public Sector Undertakings (PSUs) | State Government | Trusts, NGOs And Co-Operatives
|
1
|
TR 3357494 Dalhousie Description Of Work:- Construction of Link Road From Bagdhar To Khuin Km 0/0 To 4/200 In Tehsil Dalhousie District Chamba (HP) (SH:- Formation Cutting, A/Wall, Cross Drainage, Providing & Laying Soiling In Essential Reaches, Parapets & Road Side Kathcha Drain
|
TR 3357494 Dalhousie Description Of Work:- Construction of Link Road From Bagdhar To Khuin Km 0/0 To 4/200 In Tehsil Dalhousie District Chamba (HP) (SH:- Formation Cutting, A/Wall, Cross Drainage, Providing & Laying Soiling In Essential Reaches, Parapets & Road Side Kathcha Drain
| HIMACHAL PRADESH | 2,59,31,414.00 | 30/06/2012 |
|
2
|
TR 3224354 Execution of Electro-Mechanical works of Kalhel (2x1.25MW) Small Hydro Electric Project in Chamba district on EPC Basis. Corrigendum
|
TR 3224354 Execution of Electro-Mechanical works of Kalhel (2x1.25MW) Small Hydro Electric Project in Chamba district on EPC Basis. Corrigendum
| HIMACHAL PRADESH | Refer Detail | 30/06/2012 |
|
3
|
TR 3325419 Construction of 33/11 KV Sub-station including Civil Works.
|
TR 3325419 Construction of 33/11 KV Sub-station including Civil Works.
| HIMACHAL PRADESH | Refer Detail | 30/06/2012 |
|
4
|
TR 3365128 Construction of Link Road,
SH: Formation Cutting, Retaining Wall, Cross Drainage, Providing and Laying solling in essential reaches Parapets road side kathcha Drain.
|
TR 3365128 Construction of Link Road,
SH: Formation Cutting, Retaining Wall, Cross Drainage, Providing and Laying solling in essential reaches Parapets road side kathcha Drain.
| HIMACHAL PRADESH | 2,59,31,414.00 | 30/06/2012 |
|
5
|
TR 3369356 Providing, Laying and Compaction of WMM 7.50cm thick, WMM 10.00 cm thick DBM 5.00cm thick and SDBC 2.50cm thick Including.
|
TR 3369356 Providing, Laying and Compaction of WMM 7.50cm thick, WMM 10.00 cm thick DBM 5.00cm thick and SDBC 2.50cm thick Including.
| HIMACHAL PRADESH | 5,61,00,000.00 | 25/06/2012 |
|
6
|
TR 3338471 Construction of Science Block Building in Government Degree College at Barsar.
|
TR 3338471 Construction of Science Block Building in Government Degree College at Barsar.
| HIMACHAL PRADESH | Refer Detail | 20/06/2012 |
|
7
|
TR 3331139 Construction of Science Block Building in Govt. Degree College at Barsar (Baroli) Distt. Hamirpur.
(SH :- Construction of Building Portion i/c W.S.&S.I.).
|
TR 3331139 Construction of Science Block Building in Govt. Degree College at Barsar (Baroli) Distt. Hamirpur.
(SH :- Construction of Building Portion i/c W.S.&S.I.).
| HIMACHAL PRADESH | 1,39,36,675.00 | 20/06/2012 |
|
8
|
TR 3332259 Preparing Cumulative Impact Assessment Report Of Satluj River Basin And Consolidated Environment Impact Assessment Report For Luhri HEP.
|
TR 3332259 Preparing Cumulative Impact Assessment Report Of Satluj River Basin And Consolidated Environment Impact Assessment Report For Luhri HEP.
| HIMACHAL PRADESH | 2,13,64,860.00 | 19/06/2012 |
|
9
|
TR 3350192 Construction of Balance Work of Link Road from Nagri to Manimahesh Via Bhashmer Rakh Society Road Km 01000 to 41370 In Teh. Palampur Distt. Kangra (H.P.) (Under NABARD RIDF-XVI). Corrigendum
(SW:- Construction of Passing Places, Road Side Structure, C.D. Work, Providing and Laying Metalling Tarring, U & V Shape Drains and Parapets In Km 0/000 To 4/370).
|
TR 3350192 Construction of Balance Work of Link Road from Nagri to Manimahesh Via Bhashmer Rakh Society Road Km 01000 to 41370 In Teh. Palampur Distt. Kangra (H.P.) (Under NABARD RIDF-XVI). Corrigendum
(SW:- Construction of Passing Places, Road Side Structure, C.D. Work, Providing and Laying Metalling Tarring, U & V Shape Drains and Parapets In Km 0/000 To 4/370).
| HIMACHAL PRADESH | Refer Detail | 19/06/2012 |
|
10
|
TR 3370263 Improvement of Black Spot on Shalaghat Arki Kunihar Barotiwala Road Km 0/0 to 32/300.
|
TR 3370263 Improvement of Black Spot on Shalaghat Arki Kunihar Barotiwala Road Km 0/0 to 32/300.
| HIMACHAL PRADESH | 3,30,932.00 | 18/06/2012 |
|
11
|
TR 3370267 Improvement of Black Spot on Arki Dhundan Bhararighat Road Km 0/0 to 19/640.
|
TR 3370267 Improvement of Black Spot on Arki Dhundan Bhararighat Road Km 0/0 to 19/640.
| HIMACHAL PRADESH | 6,20,025.00 | 18/06/2012 |
|
12
|
TR 3370273 Improvement of Black Spot SAKB Road Km 0/0 to 17/500.
|
TR 3370273 Improvement of Black Spot SAKB Road Km 0/0 to 17/500.
| HIMACHAL PRADESH | 4,61,594.00 | 18/06/2012 |
|
13
|
TR 3370281 Construction of Assistant District Attorney office Cum residence at Arki District Solan.
|
TR 3370281 Construction of Assistant District Attorney office Cum residence at Arki District Solan.
| HIMACHAL PRADESH | 33,33,322.00 | 18/06/2012 |
|
14
|
TR 3370288 Construction of Galog Halog Road SH: Construction of Missing Left Out CD Work at RD 0/365 0/750 and 1/025.
|
TR 3370288 Construction of Galog Halog Road SH: Construction of Missing Left Out CD Work at RD 0/365 0/750 and 1/025.
| HIMACHAL PRADESH | 4,78,396.00 | 18/06/2012 |
|
15
|
TR 3370721 Construction of Yatri Niwas building
SH: Building Portion and site Development
|
TR 3370721 Construction of Yatri Niwas building
SH: Building Portion and site Development
| HIMACHAL PRADESH | 55,28,756.00 | 17/06/2012 |
|
16
|
TR 3365102 Construction of Balance Work of Tikkan Tannaji Lakhnoti Road,
SH: Formation Doficiency Retaining Structure RCC, Hume Pipe Culvert, Sub Base Grade-I, Base Course Grade-II and Grade-III, Open graded premix carpet with Seal coat Road side parapets, Drains and wire crate.
|
TR 3365102 Construction of Balance Work of Tikkan Tannaji Lakhnoti Road,
SH: Formation Doficiency Retaining Structure RCC, Hume Pipe Culvert, Sub Base Grade-I, Base Course Grade-II and Grade-III, Open graded premix carpet with Seal coat Road side parapets, Drains and wire crate.
| HIMACHAL PRADESH | 3,51,39,691.00 | 15/06/2012 |
|
17
|
TR 3374806 Construction Of Balance Work Of Tikkari Tannaji Lakhoti Road Km.0/0 To 11/580 Under NABARD RIDF XVI.
|
TR 3374806 Construction Of Balance Work Of Tikkari Tannaji Lakhoti Road Km.0/0 To 11/580 Under NABARD RIDF XVI.
| HIMACHAL PRADESH | 3,33,65,723.00 | 13/06/2012 |
|
18
|
TR 3370323 Construction of Shops Along the Bus Stand Hamirpur Block – B.
|
TR 3370323 Construction of Shops Along the Bus Stand Hamirpur Block – B.
| HIMACHAL PRADESH | 22,69,526.00 | 13/06/2012 |
|
19
|
TR 3370320 Construction of Shops Along the Bus Stand Hamirpur Block – A.
|
TR 3370320 Construction of Shops Along the Bus Stand Hamirpur Block – A.
| HIMACHAL PRADESH | 27,48,284.00 | 13/06/2012 |
|
20
|
TR 3370330 Construction of Link Road to Village Khaneu Km 0/0 to 1/0.
|
TR 3370330 Construction of Link Road to Village Khaneu Km 0/0 to 1/0.
| HIMACHAL PRADESH | 3,22,752.00 | 13/06/2012 |
|
|
 |
|
 |
|
|