1
|
TR 1837985 Development of Amlabad Under Ground Mines and Extraction of Coal from Amlanad XV, XIV, XI/XII, X, IX and VIII Seam by Mass Production Technology Packages for a Minmum Guaranteed Production of 0.50 Million Tonne Per Annum of Coal on Turnkey Basis. After Refurbishment / Restoration of Existing Entries and Additional Drills, Explollation of the Virgin/ Developed Seams Above XV Scheme work Includes Preparation of Detailed Peoject Report, Approval of Mining Plan, Environmental Clearance, any Additional Drilling if Required Supply of and Restoring Shaft Entries, Additional Drills / Shaft Deepening and Widening etc in Order to Meet the Guaranteed Production. Corrigendum
| JHARKHAND | Refer Document | 22/11/2010 |
|
2
|
TR 1797058 Rate Contract for Supply of Fabricated Steel Structures of Main Girder Fitted With Working and Trailing Platform and Aux. Girder Fitted With Platform and Trolley Frames Along With Fastener.
| JHARKHAND | Refer Document | 13/11/2010 |
|
3
|
TR 1784122 Selection of Bidders for University Management System ( UMS ).
| JHARKHAND | Refer Document | 10/11/2010 |
|
4
|
TR 1786476 Providing University Management System ( UMS ).
| JHARKHAND | Refer Document | 01/11/2010 |
|
5
|
TR 1776422 Development of Amlabad Under Ground Mines and Extraction of Coal From Amlabad XV,XIV,XI/XII,X,IX and VIII Seam by Mass Production Technology Package for a Minimum Guaranteed Production of 0.50 MTY of Coal on Turnkey Basis.
| JHARKHAND | Refer Document | 25/10/2010 |
|
6
|
TR 1800216 Design, Engineering, Planning, Procurement, Supply, Manufacture/Fabrication, Painting, Erection, Testing and Inspection, Commissioning and Performance, Testing, Complete in all Respect, on EPC/Turnkey Basis of all Mechanical, Electrical, Civil, Structural, Architectural, Air Conditioning and Ventilation, Environmental Management, Instrumentation and Control with all Equipment and Accessories for the Crushing, Grinding, Neutral Thickening Sand Siime, Separation, Tailing Disposal, Water, Compressed Air and Allied System, Fire Detection and Alarm System and HVAC Having a Capacity to Treat 1500MT/Day of Ore at Tummalapalle.
| JHARKHAND | Refer Document | 25/10/2010 |
|
7
|
TR 1821814 Supply of Artificial Lung Machine along with Computerized Data Recording and Analysis System.(1) Breathing Machine (2) Auxiliary Lung (3) Valves (4) Two way Solenold Valve (5) Servoactuated Valve for Auxiliary Lung (6) Air Humidifier (7) Cooling Chamber (8) Connections (9) Molster Trap (10) Measurement Facilities (11) Dynamic Breathing Resistance Measurement (12) Oxygen Connection Measurement in Inhalation (13) Co2 Concentration Monitoring (14) Temperature Monitoring (15) Control Cabinet to House (16) Calibration Standard (17) Mass Flow Controller for CO2 Gas (18) Computer Interfacing Device (19) Historical Trend / Graphical Analysis (20) Printing of Reading and Historical Trend Analysis.
| JHARKHAND | Refer Document | 25/10/2010 |
|
8
|
TR 1836143 Providing of Furniture for OTM Accn Ph-III at Diptoli.
| JHARKHAND | 5,35,000.00 | 25/10/2010 |
|
9
|
TR 1836181 Procurement of Boiler Lubes for Boiler for Unit 1, 2 and 3 CTPS.
| JHARKHAND | 1,88,22,500.00 | 25/10/2010 |
|
10
|
TR 1837888 Supply and Installation of Liner Accelerator With IGRT and Its Other Accessories and Supporting Equipment for Onocology Department on Turnkey Basis at RIMS, Ranchi, Jharkhand, India.
| JHARKHAND | Refer Document | 25/10/2010 |
|
11
|
TR 1819673 Supply of Kwik TIP Adopters ,TIP Points etc for 24/96 Drag Line.
| JHARKHAND | 16,52,000.00 | 21/10/2010 |
|
12
|
TR 1830103 Repair and Maintenance of Colour Light Signaling System under Sr. Section Engineer (E)/Dhanbad and Gomoh - 1) Trenching, Laying and back filling of XLPE cable as per Sr.DEE(G)/DHN's Drg. No. EL/486-01 (DHN- 5790 Mtr + GMO- 12950 Mtr) (Cable will be supplied by the Railway) 2) Supply and fixing of GI pipe medium gauge 2" dia thickness 4.47mm (70SWG) with suitable clamp, nut bolt etc (DHN- 80mtr + GMO-100 mtrs) (Make: TATA/JINDAL/BANSAL) 3) Supply and Fixing of Straight through joint kit 4-core 25mm2 (DHN-20 nos. + GMO- 35 nos) (Make: 3M Electricals or similar).
| JHARKHAND | Refer Document | 20/10/2010 |
|
13
|
TR 1830176 Electrical Works in Connection With Improvement of Front Façade, Circulating Area, Waiting Rooms, Retiring Rooms Etc. At Daltonganj - 1) Supply, Fabrication & Erection Of Heavy Gauge Steel Tubular Pole Complete With All Accessories SP-968 Of Mahindra Or Similar. (Drawing Should Be Approved By Competent Authorioty Before Supply) 2) Erection Of Street Light Luminaries 4 X 24W Including Wiring With PVC Insulated, S/Core Stranded Copper Conductor Of 1.5mm2 And Connection Through GI Pipe Of 38mm Dia, 6- Feet Long And Bend To Shape As Per Site Requirement And Fixing The Same With Suitable Clamps, Nuts, Bolts & Washers. (Fittings Will Be Supplied By The Railway) 3) Fixing Of TICINO With Mirror Reflector Fitting T5, Ticino 2 X 28W With Cutting Of Groove Etc And Other Accessories. (Fitting Will Be Supplied By The Railway) 4) Wiring Of Light Point With PVC Insulated, Sheathed And Stranded Single Core Copper Conductor 1.5mm2 With ECC In PVC Pipe In Concealed With Proper Excavation And Refilling The Wall With Proper Plastering Of The Wall With Supply & Fixing Of Switch/Ceiling Rose/Angular/Batten Holder. 5) Wiring Of Sub-Main Line With Copper Wire Single Core 6mm2 Multi Strand With PVC In Concealed With Proper Excavation And Refilling The Wall With Proper Plastering. 6) Wiring Of Main Line With Copper Wire Single Core Size 10mm2 Multi Strand With PVC In Concealed With Proper Excavation And Refilling The Wall With Proper Plastering. 7) Supply And Fixing Of Fan Clamp Made Of MS Flat And Hook Arrangement To Take 20Kg. Load. 8) Wiring Of Fan Point With PVC Insulated Sheathed & Stranded Single Core Copper Conductor 1.5mm2 With ECC In PVC Pipe In Concealed With Proper Excavation And Refilling The Wall With Proper Plastering Of The Wall With Supply And Fixing Of Switch & Ceiling Rose Etc. 9) Supply & Fixing Of TW Main Board 21. X 14. Comp. With 4-Way Distribution Box, Double Pole Switch Surface Type 32A Capacity With Indication Lamp, Kit-Kat Porcelain Base Fuse Grip Including Internal Wiring And Connection. 10) Digging Of Earth Including Supply And Erection Of GI Pipe 2. Dia 8Ft Long Medium Gauge .B.: Class As Per Drawing No: EL/T/007-81 Including Connection With GI Wire From Earth Pipe To Main Board With 2-Length Of 4-SWG GI Wire And CI Clamp At Thetop Of The GI Pipe Cone To Be Fitted At The Bottom End Of The GI Pipe. GI Wire Should Be Connected With Nut, Bolt At GI Pipe Trop On CI Clamp. 11) Trenching, Laying And Back Filling Of XLPE Cable As Per Sr. DEE (G)/Dhanbad.S Drg No: EL/486-01 (Cable Will Be Supplied By The Railway). 12) Wiring Of Plug Point With PVC Insulated, Sheathed And Stranded Single Core Copper Conductor 1.5mm2 With ECC In PVC Pipe In Concealed With Proper Excavation And Refilling The Wall With Proper Plastering Of The Wall With Supply & Fixing Of 5 Amp Plug & Socket, Switch.
| JHARKHAND | Refer Document | 20/10/2010 |
|
14
|
TR 1830068 Renovation of Lighting and Fan at Garhwa Road Station - ARM BRACKET) As Per 410 SP 3 Bottom Size 114.30mm Dia 5.4mm Thick, Top 88.9mm Dia And 84.85 Mm Thick, Top 76.1mm Dia And 3.25mm Thick Along With Anchor Base Plate 200mmx200mmx5mm In Built J.B. On The Bottom Section Of The Pole. Consisting Of TPN Copper Busbar Of 32Amp Cap. And 2 Nos. 5Amp Kit Fuse And 2-Pole 25sq.Mm Single Alum. Conductor Cable Of 110V Grade From Jn. Box To FL Fitting, 2) Supply Of Street Light Fitting, T-5, 4x24w, IP 65, Similar To SIAN Product No. ABFFS43500, Make: Asian/Philips/Bajaj/Crompton Greeves /Havells), 3) Erection Of Above Street Light Including Wiring With PVC Insulated, Single Core, Stranded Alum. Conductor 2.5mm2 As Per Site Requirement And Fixingf The Same With Suitable Clamps, Nuts, Bolts And Washers, 4) Supply & Fixing Of Decorative Ultra Slim Box Fixture With German Diffuser, Snap-On Installars And Domestic Ballast FL Fitting 1x28Watt, T-5 Including T-5, 5 Star Tube 28W (O.No. LHDFO7128032), 5) Wiring Of Light Points With PVC Insulated, Sheathed & Stranded Single Core Copper Conductor 1.5mm2 With ECC In PVC Pipe In Concealed With Proper Excavation And Refilling The Wall With Proper Plastering Of The Wall With Supply & Fixing Of Switch /Ceiling Rose/Angular/Batten Holder Etc, 6) Trenching, Laying And Back Filling Of XLPE Cable As Per Sr.DEE (G)/DHN's Drg. No. EL/486-01 (Cable Will Be Supplied By The Railway), 7) Wiring Of Plug Point 5Amp With PVC Insulated, Sheathed & Stranded Single Core Copper Conductor Cable 1.5mm2 In PVC Pipe In Concealed With Proper Excavation And Refilling The Wall With Proper Plastering Of The Wall With Supply & Fixing Of 5Amp Piano Type Switch And Socket 5- In-1 Including Connection, 8) Fabrication, Supply, And Erection Of LT Panel Consisting With (A) 01 No. MCCB,DTH, 3-Pole, 400A 360 500A Thermal Release Range, 50ka As Incoming And (B) 01 No. MCCB-DTH-3-Pole- 200A,50ka, ( C) 01 No. MCCB-3-Pole, 100A, 50ka As Outgoing Including (D) 01 No. Voltmeter (0-500V) (E) 01 No. Ammeter (0-100A), (F) Selector Switch For Both Voltmeter And Ammeter, (G) 03 Nos. Indication Lamp (RYB) (H) Copper Busbar, 3-Phase, 4-Wire, 1250A-25Kg (I) 14SWG Sheet Metal Fabricated Cubical Type Panel Board Including Busbar Chamber, Duly Painted Size: 3'x3'x1.5'=13.5 Cu.Ft Including Installation, Testing, Painting & Commissioning Etc. (Panel Make: ABB, L&T, PCES, CPRI Type Tested).
| JHARKHAND | Refer Document | 20/10/2010 |
|
15
|
TR 1830085 Renovation of Lighting and Fan at Chandrapura Station - ARM BRACKET) As Per 410 SP 3 Bottom Size 114.30mm Dia 5.4mm Thick, Top 88.9mm Dia And 84.85 Mm Thick, Top 76.1mm Dia And 3.25mm Thick Along With Anchor Base Plate 200mmx200mmx5mm In Built J.B. On The Bottom Section Of The Pole. Consisting Of TPN Copper Busbar Of 32Amp Cap. And 2 Nos. 5Amp Kit Fuse And 2-Pole 25sq.Mm Single Alum. Conductor Cable Of 110V Grade From Jn. Box To FL Fitting, 2) Supply Of Street Light Fitting, T-5, 4x24w, IP 65, Similar To SIAN Product No. ABFFS43500, Make: Asian/Philips/Bajaj/Crompton Greeves /Havells), 3) Erection Of Above Street Light Including Wiring With PVC Insulated, Single Core, Stranded Alum. Conductor 2.5mm2 As Per Site Requirement And Fixingf The Same With Suitable Clamps, Nuts, Bolts And Washers, 4) Supply & Fixing Of Decorative Ultra Slim Box Fixture With German Diffuser, Snap-On Installars And Domestic Ballast FL Fitting 1x28Watt, T-5 Including T-5, 5 Star Tube 28W (O.No. LHDFO7128032), 5) Wiring Of Light Points With PVC Insulated, Sheathed & Stranded Single Core Copper Conductor 1.5mm2 With ECC In PVC Pipe In Concealed With Proper Excavation And Refilling The Wall With Proper Plastering Of The Wall With Supply & Fixing Of Switch /Ceiling Rose/Angular/Batten Holder Etc, 6) Trenching, Laying And Back Filling Of XLPE Cable As Per Sr.DEE (G)/DHN's Drg. No. EL/486-01 (Cable Will Be Supplied By The Railway), 7) Wiring Of Plug Point 5Amp With PVC Insulated, Sheathed & Stranded Single Core Copper Conductor Cable 1.5mm2 In PVC Pipe In Concealed With Proper Excavation And Refilling The Wall With Proper Plastering Of The Wall With Supply & Fixing Of 5Amp Piano Type Switch And Socket 5- In-1 Including Connection, 8) Fabrication, Supply, And Erection Of LT Panel Consisting With (A) 01 No. MCCB,DTH, 3-Pole, 400A 360 500A Thermal Release Range, 50ka As Incoming And (B) 01 No. MCCB-DTH-3-Pole- 200A,50ka, ( C) 01 No. MCCB-3-Pole, 100A, 50ka As Outgoing Including (D) 01 No. Voltmeter (0-500V) (E) 01 No. Ammeter (0-100A), (F) Selector Switch For Both Voltmeter And Ammeter, (G) 03 Nos. Indication Lamp (RYB) (H) Copper Busbar, 3-Phase, 4-Wire, 1250A-25Kg (I) 14SWG Sheet Metal Fabricated Cubical Type Panel Board Including Busbar Chamber, Duly Painted Size: 3'x3'x1.5'=13.5 Cu.Ft Including Installation, Testing, Painting & Commissioning Etc. (Panel Make: ABB, L&T, PCES, CPRI Type Tested) 9 Supply & fixing of TW main board 21 x 14" complete with 01 no. MCB-20Amp Main Switch capacity and DB, 4-way with Indication (Neon) lamp, kit-kat fuse including connection and internal wiring 10 Wiring of sub-Main Line with copper wire single core size 6mm2 multistrand with PVC pipe in concealed with proper excavation and refilling the wall with proper plastering. 11 Wiring of Main Line with copper wire single core size 10mm2 multistrand with PVC pipe in concealed with proper excavation and refilling the wall with proper plastering. 12 Supply & fixing of GI pipe medium gauge 2" dia with suitable clamps, nuts, bolts etc as per requirement 13 Supply & erection of T-19, 50mm dia electrode GI pipe earthing, test conducted short time current 20kA rms for 1-sec CPRI type test, length 3000/2000mm, outer dia: 50mm, inner dia: 25mm, terminal hole dia: 14mm, outer wall thick: 18SWG (1.219mm), inner wall thick: 12SWG (2.641mm), galvanization: 80-100U. Outer electrode, space inside filled with crystalline conductive mixture (CCM) earthing system comes with an ideal back fill compound (B.F.C.).
| JHARKHAND | Refer Document | 20/10/2010 |
|
16
|
TR 1830092 Renovation of Lighting and Fan at Barkakana Station - ARM BRACKET) As Per 410 SP 3 Bottom Size 114.30mm Dia 5.4mm Thick, Top 88.9mm Dia And 84.85 Mm Thick, Top 76.1mm Dia And 3.25mm Thick Along With Anchor Base Plate 200mmx200mmx5mm In Built J.B. On The Bottom Section Of The Pole. Consisting Of TPN Copper Busbar Of 32Amp Cap. And 2 Nos. 5Amp Kit Fuse And 2-Pole 25sq.Mm Single Alum. Conductor Cable Of 110V Grade From Jn. Box To FL Fitting, 2) Supply Of Street Light Fitting, T-5, 4x24w, IP 65, Similar To SIAN Product No. ABFFS43500, Make: Asian/Philips/Bajaj/Crompton Greeves /Havells), 3) Erection Of Above Street Light Including Wiring With PVC Insulated, Single Core, Stranded Alum. Conductor 2.5mm2 As Per Site Requirement And Fixingf The Same With Suitable Clamps, Nuts, Bolts And Washers, 4) Supply & Fixing Of Decorative Ultra Slim Box Fixture With German Diffuser, Snap-On Installars And Domestic Ballast FL Fitting 1x28Watt, T-5 Including T-5, 5 Star Tube 28W (O.No. LHDFO7128032), 5) Wiring Of Light Points With PVC Insulated, Sheathed & Stranded Single Core Copper Conductor 1.5mm2 With ECC In PVC Pipe In Concealed With Proper Excavation And Refilling The Wall With Proper Plastering Of The Wall With Supply & Fixing Of Switch /Ceiling Rose/Angular/Batten Holder Etc, 6) Trenching, Laying And Back Filling Of XLPE Cable As Per Sr.DEE (G)/DHN's Drg. No. EL/486-01 (Cable Will Be Supplied By The Railway), 7) Wiring Of Plug Point 5Amp With PVC Insulated, Sheathed & Stranded Single Core Copper Conductor Cable 1.5mm2 In PVC Pipe In Concealed With Proper Excavation And Refilling The Wall With Proper Plastering Of The Wall With Supply & Fixing Of 5Amp Piano Type Switch And Socket 5- In-1 Including Connection, 8) Fabrication, Supply, And Erection Of LT Panel Consisting With (A) 01 No. MCCB,DTH, 3-Pole, 400A 360 500A Thermal Release Range, 50ka As Incoming And (B) 01 No. MCCB-DTH-3-Pole- 200A,50ka, ( C) 01 No. MCCB-3-Pole, 100A, 50ka As Outgoing Including (D) 01 No. Voltmeter (0-500V) (E) 01 No. Ammeter (0-100A), (F) Selector Switch For Both Voltmeter And Ammeter, (G) 03 Nos. Indication Lamp (RYB) (H) Copper Busbar, 3-Phase, 4-Wire, 1250A-25Kg (I) 14SWG Sheet Metal Fabricated Cubical Type Panel Board Including Busbar Chamber, Duly Painted Size: 3'x3'x1.5'=13.5 Cu.Ft Including Installation, Testing, Painting & Commissioning Etc. (Panel Make: ABB, L&T, PCES, CPRI Type Tested) 9 Supply & fixing of TW main board 21 x 14" complete with 01 no. MCB-20Amp Main Switch capacity and DB, 4-way with Indication (Neon) lamp, kit-kat fuse including connection and internal wiring 10 Wiring of sub-Main Line with copper wire single core size 6mm2 multistrand with PVC pipe in concealed with proper excavation and refilling the wall with proper plastering. 11 Wiring of Main Line with copper wire single core size 10mm2 multistrand with PVC pipe in concealed with proper excavation and refilling the wall with proper plastering. 12 Supply & fixing of GI pipe medium gauge 2" dia with suitable clamps, nuts, bolts etc as per requirement 13 Supply & erection of T-19, 50mm dia electrode GI pipe earthing, test conducted short time current 20kA rms for 1-sec CPRI type test, length 3000/2000mm, outer dia: 50mm, inner dia: 25mm, terminal hole dia: 14mm, outer wall thick: 18SWG (1.219mm), inner wall thick: 12SWG (2.641mm), galvanization: 80-100U. Outer electrode, space inside filled with crystalline conductive mixture (CCM) earthing system comes with an ideal back fill compound (B.F.C.).
| JHARKHAND | Refer Document | 20/10/2010 |
|
17
|
TR 1834705 Renovation of Lighting Fan at Garhwa Road Station.
| JHARKHAND | 15,82,161.00 | 19/10/2010 |
|
18
|
TR 1834676 Electrical Works in Connection with Improvement of Front.
| JHARKHAND | 1,09,280.00 | 19/10/2010 |
|
19
|
TR 1834681 Electrical Works in Connection with Improvement to Coaching sick line at Dhanbad.
| JHARKHAND | 20,14,497.00 | 19/10/2010 |
|
20
|
TR 1834687 Repair Maintenance of Colour Light Signaling System under Sr Section Engineer E Dhanbad Gomoh.
| JHARKHAND | 13,04,750.00 | 19/10/2010 |
|
|
|
 |
|
 |
|
|