Contractor
Tendering Tools
Quick Tender Search
Advanced Tender Search
|
CPWD Guideline, Rules & Forms for
Enlistment of Contractor in CPWD
About CPWD
1.0 Central Public Works Department (CPWD) under Ministry
of Urban Development is entrusted with construction and maintenance of buildings
for most of the Central Government Departments, Public undertakings and Autonomous
bodies.
2.0 Vision Statement – Excellence in Public Works
3.0 Mission Statement
3.1 Sound Planning and Design
3.1.1 All buildings norms and specification to be standardized.
3.1.2 Architectural and structural design to be undertaken
and coordinated to evolve an efficient building system compliant with latest Indian
Standard.
3.2 Engineered Construction
3.2.1 Mechanization in construction including use of
innovative materials and techniques.
3.2.2 Conservation of energy and natural resources and
clean environment in construction stage.
3.3 Effective Maintenance
3.3.1 To preserve and maintain buildings and services
in good operating condition and to adopt latest state of development taking place
in built environment
3.4 Benchmarking
3.4.1 Updation of Standards and Specifications for public
works and their publication at regular interval.
3.4.2 Updation of Delhi Schedule of Rates and Analysis
of Rates Updation of works and Maintenance Manual on regular basis & their publication.
3.5 Capacity Building
3.5.1 Updation of technical knowledge of engineers, architects
through training and high level refresher courses and participation in seminars,
workshops etc.
3.5.2 Target oriented training to maintenance workers
on contemporary skills and behavioral science to improve service delivery mechanism.
3.6 Manpower planning
3.6.1 To achieve excellent working opportunities and
professional environment.
3.6.2 To provide performance and ability based approach
to career development as per policy of the Government.
3.7 Transparency in work management
3.7.1 e-tendering being introduced.
3.7.2 Effective use of websites in discharge of regulatory,
enforcement and other functions being introduced through integrated computerization.
3.7.3 Web based work progress monitoring system is being
introduced.
4.0 Mandate for CPWD
4.1 Construction works:
4.1.1 Provide Turnkey Project Management services from
concept to completion of buildings with inbuilt quality assurance, financial and
technical accountability.
4.2 Maintenance Services
4.2.1 Provide a comprehensive network of service Centres
for recording, redressel and monitoring of complaint through single window system.
4.3 Grievance Redressal Mechanism
4.3.1 Designated Grievance Officer shall ensure effective
redressel of Public Grievances.
4.3.2 Designated Nodal Officer at Directorate shall:
Ensure that processes needed for rendering effective services to users are established,
implemented and maintained including getting feedback on user satisfaction.
5.0 Solicits from Users
5.1 Construction works:
5.1.1 Assistance and cooperation by providing ownership
documents etc. for land and building to obtain approval of building plans and clearances
for service connections of their behalf from local bodies and to take over the completed
work expeditiously.
5.2 Maintenance services:
5.2.1 Not to make any unauthorized construction of any
additions / alteration, tempering of installations of the premises allotted to them.
5.2.2 Maintain the accommodation allotted and the surroundings
in a hygienic manner and conform to the rules and regulations of the local bodies
in this regard.
5.2.3 To produce “No Dues Certificate” from service provider
at the time of vacation.
CPWD Guideline, Rules & Forms for Enlistment of Contractor
in CPWD
Note : the Content of this Page has been taken from http://cpwd.gov.in
, a Central Government Undertaking official Website. This content is for the Information
of Government Contractors only. For detailed and Updated Information please visit
official website of Central Public Works Department (CPWD).
|